Open Closing in a 10 days
BBV HS2 MWCC North - Noise Barrier Piles
Descriptions
This requirement is related to the construction of piles for the HS2 Phase 1 Main Works Civils Contracts.
These works are integral to the structural stability of noise barriers and other infrastructure elements, ensuring compliance with HS2's engineering and environmental standards.
Key aspects of this package include:
> Collaborative review of Contractor designs to incorporate constructability considerations.
> Provision of labour, materials, and equipment required for piling construction.
> Implementation of quality assurance measures and adherence to technical specifications.
> Coordination with other sub-lot activities to ensure seamless integration and progress.
The package is segmented by geographical sub-lots (N1 and N2), with detailed requirements provided for each location in accordance with site-specific constraints.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
34928230 - Noise fence
45350000 - Mechanical installations
Keywords
noise fence
acoustic fence
sound barrier fence
highway noise barrier
sound-reduction fencing
acoustic barrier fencing
traffic noise fencing
roadside noise wall
soundproof fence
environmental noise fence
mechanical installation work
machinery mounting
plant equipment installation
mechanical system setup
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors