Awarded

Botley Bypass Phase 3 Otter Mitigation Licence

Descriptions

A call-off from Lot B8 of the Place, Connectivity & Infrastructure Professional Services Framework 2022-2026 (Published 4 March 2022).

An Otter holt has been identified within an area which would be subject to disturbance impacts as a result of the construction of Phase 3 of the Botley Bypass Scheme. A Natural England Mitigation Licence is therefore required to undertake works which could cause disturbance. Hampshire County Council require an experienced ecologist who can be the Named Ecologist on the Mitigation Licence

Timeline

Published Date :

21st Jul 2025 1 month ago

Deadline :

17th Apr 2025 5 months ago

Tender Awarded :

1 Supplier

Awarded date :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

Keywords

engineering design consultancy

technical design services

multidisciplinary engineering planning

engineering specification services

system design engineering

engineering blueprint consultancy

project design advisory

engineering drafting services

conceptual engineering

technical design solutions

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

No

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors