Project Scope:
- The objective of this project is to reduce nitrogen loadings in the Teesmouth and Cleveland Coast Special Protection Area (SPA) by 1st April 2030. This will be achieved by removing the Bran Sands discharge from the River Tees and discharging directly to the North Sea to improve dispersion and dilution.
- A Long Sea Outfall for Bran Sands has been supported and approved by Ofwat in the final determination of NWG's PR24 (business plan).
- The Levelling Up and Regeneration Act (2023) requires Technically Achievable Limit of Total Nitrogen of 10mg/l at 'designated STWs' that serve a population equivalent of more than 2,000 people by 1 April 2030 and are within the Nutrient Neutrality area.
- To deliver this, the driver was included in the Water Industry National Environment Programme (WINEP) under the Habitats Directive for Nutrient Neutrality.
Project Brief - Option Detail:
- The project indicatively consists of three works packages outlined below:
- Onshore Headworks/Pumping Station
- Onshore pipeline - 3km 2m diameter
- Offshore pipeline - 4.5km 2m diameter
The packages may be tendered and awarded individually or in combination.
Types of work under the packages may include (but are not limited to):
- Design of pumped marine outfall pipeline systems
- Early Contractor Involvement and/or Works Contractor(s)
- Onshore environmental, geotechnical and geophysical surveys
- Offshore environmental, geotechnical and geophysical surveys
- Onshore tunnelling (tbc)
- Offshore tunnelling (tbc)
- Flow collection chamber/Pumping station and/or Headworks pumping station - civil, mechanical, electrical and ICA
- Dredged outfall installation - long length large diameter PE with concrete ballast
- Marine structures - outfall diffuser and diffuser protection
Engagement
General Information: It is mandatory for any interested suppliers to register on the new CENTRAL DIGITAL PLATFORM which is part of the enhanced Find a Tender Service (Procurement Act 2023). NWG welcomes interest from all suitable contractors / suppliers Contractors may have expertise in any of the three distinct packages of work. At this stage, NWG expect individual entity responses to this notice. Once procurement strategy has been defined, it is appreciated that delivery approaches may involve responses from JVs/Consortium Project Brief - Option Detail: The project indicatively consists of three works packages: - Onshore Headworks/Pumping Station - Onshore pipeline - 3km 2m diameter - Offshore pipeline - 4.5km 2m diameter Aims of Market Engagement: - Understand current market conditions and appetite for schemes of this nature - Understanding supplier's capability and capacity to deliver schemes of this nature - Understand and develop the procurement strategy for the project, which could include exclusive use of the Client's established framework partners or a mix of Client's framework partners and open market competition - Reviewing how work could be packaged and advertised to the market (i.e splitting into lots, advertising as one scheme etc) to deliver best value - Seeking feedback from the market to understand how NWG can be an attractive client, ensuring the procurement process is proportionate to the size and complexity of the project Market Engagement Process: - Initial Conditions of Participation to exclude any suppliers who are on Debarment List or are not registered on Central Digital Platform - Completion of contractor questionnaire via Microsoft Forms requesting information on contractor capabilities, previous experience of a similar nature, how contractors can add value to the market engagement process - NWG will review questionnaire returns and select the most suitable suppliers to attend the engagement session. Preference will be given to those suppliers with a recent demonstrable track record of delivering long length large-diameter outfall pipeline projects (or part thereof) of this nature - In-person workshop / round table session with all invited participants (expect to invite c15). Date to be confirmed to shortlisted suppliers once known - Upon completion of market engagement, the Client will develop a procurement strategy to deliver the project, if this results in an open market competition, any material shared during the engagement process will be included within the tender documents. Call to Action: Expressions of interest to complete the questionnaire must be sent to the e-mail address amp8procurement@nwl.co.uk before the deadline date of 20/08/2025 at Midday. Once the expression of interest window has closed, a link to the questionnaire will be sent to the email address you provide on 21/08/2025. The deadline for completing the questionnaire is 04/09/2025 at 5pm. When sending expression of interest, applicants must provide the following information: 1) Full company name, 2) Key contact (name, email address to receive the questionnaire link, mobile number) 3) Type of company: - D&C organisation, - Specialist service provider (please detail: eg Tunnelling (offshore/onshore)/Specialist Surveys/Marine Structures), - Other (please detail) Those suppliers selected for further engagement may be invited to an in-person workshop on Tuesday 16th September. Further details will be provided following receipt of questionnaires.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
44162300 - Outfall piping
44161400 - Underwater pipeline
45232424 - Sewage outfall construction work
45232431 - Wastewater pumping station
71351200 - Geological and geophysical consultancy services
45221247 - Tunnelling works
71311100 - Civil engineering support services
71351910 - Geology services
45232411 - Foul-water piping construction work
71311300 - Infrastructure works consultancy services
45232410 - Sewerage work
45232421 - Sewage treatment works
45231300 - Construction work for water and sewage pipelines
71351810 - Topographical services
71351500 - Ground investigation services
71351210 - Geophysical consultancy services
45232420 - Sewage work
45232440 - Construction work for sewage pipes
71332000 - Geotechnical engineering services
71313400 - Environmental impact assessment for construction
45232423 - Sewage pumping stations construction work
71322200 - Pipeline design services
71351900 - Geology, oceanography and hydrology services
44163130 - Sewer pipes
45232400 - Sewer construction work
71351220 - Geological consultancy services
45231100 - General construction work for pipelines
44161410 - Subsea pipelines
71354500 - Marine survey services
45252124 - Dredging and pumping works
45232152 - Pumping station construction work
Keywords
geology
contour mapping
rock analysis
TBM tunnelling
hydrology
subsea pipeline
waste conduits
borehole testing
sludge removal
geotech design
marine pipework
EIA consultancy
sewer pipes
sanitation lines
outfall piping
terrain analysis
seabed studies
subsea conduit
subsea mapping
bedrock analysis
tunnel shafting
tunnel boring
elevation survey
bedrock studies
oceanography
tunnelling works
soil testing
soil profiling
sewage tubing
marine science
topographic consultancy
subsurface investigation
cadastral topography
drainage pipeline works
sewer system erection
soil testing engineering
public works support
exploration geophysics
water resource studies
water treatment works
geotechnical support
fluid line installation
ground data consultancy
effluent lift works
effluent conduits
marine survey services
sewer service line build
offshore utility channel
project EIA services
geology consultancy
river discharge pipeline
foundation inspection
geotechnical assessment
municipal sewer works
sewage lift unit build
subsurface soil analysis
marine sewage outfall
stratigraphic analysis
geophysical modelling
drainage pipe erection
soil geology advisory
pipeline dredge and pump
geological assessment
sewage main laying
site topography analysis
geotechnical sampling
geotechnical drilling
urban works advisory
domestic sewage plumbing
pumping infrastructure
municipal drain build
waste-water pipework
wastewater line build
seismic interpretation
sediment analysis
geotech survey services
seismic investigation
utility water line build
pumping station build
underground drain pipes
foundation investigation
geological mapping
foul-water trench laying
hydrological research
site grading survey
geological risk advisory
sewer main laying
tunnel lining work
utility line civil works
buried utility design
geotechnical consultancy
geological surveying
sonar seabed surveys
seismic consultancy
pipeline building work
site investigation
subterrain tunnel work
geological profiling
topography data services
site impact assessment
tunnel excavation works
sewerage civil works
site geology consultancy
public works advisory
drilling geology support
sewer line construction
mineral evaluation
drainage sewer project
foul drain network build
sewage outfall build
subsurface testing
sewage disposal conduit
discharge pipelines
sewage treatment station
geoscience strategy
terrain surveying
sewer pump house works
geological exploration
treatment plant dredging
geophysics consultancy
sewage pipe build
ground condition survey
coastal hydrology
utility pumping hub
sanitary sewer build
earth science advice
sewage pipe installation
wastewater main laying
foul water piping build
land surface mapping
geophysical analysis
civil tunnelling project
geoscience consultancy
bridge support services
earthworks consultancy
civil project assistance
earth structure advice
wastewater network works
trench & pipe laying
sewer network pipework
topographic mapping
sewage pump works
broad pipeline work
rock-boring for tunnels
marine transmission line
ground survey services
treatment plant erection
sub-surface sewer work
road inspection support
offshore surveying
sewage pipeline build
sewage outlet pipes
subsurface consultancy
sediment suction works
pipeline layout planning
deepwater pipeline
structural survey
geological surveys
sewage piping works
ocean-bed pipeline
oceanographic analysis
marine inspection
dredging and pumping
sewerage infrastructure works
infrastructure planning consulting
outfall conduit construction
infrastructure project feasibility
geological advisory services
sub-surface sewage pipework
effluent handling structure
aquatic environment analysis
civil works technical assistance
treated sewage discharge works
disposal outfall infrastructure
wastewater lift plant build
pipeline technical drawings
site investigation engineering
stormwater/sewer conduit work
sewage treatment plant construction
construction EIA reporting
watercourse dredge services
sanitary pump site construction
fluid transport systems planning
water pipeline installation
sewage pump unit construction
sewage purification works
effluent discharge pipeline installation
conduit trench construction
pumping plant construction
underground sewer trenching
gas and oil pipeline design
sewer main pipeline works
sewerage network construction
pumping infrastructure build
effluent processing facility build
sanitary sewer installation
wastewater pump station build
EIA documentation services
offshore fluid conveyance
sanitation network installation
effluent lift facility build
municipal sewage pipe installation
pumping station infrastructure
fluid transport pipelaying
infrastructure engineering consultancy
sewage conduit construction
project environmental evaluation
sanitation pipe construction
wastewater pipeline build
subsurface sensing consultancy
environment discharge structure
sewage network construction
silt pumping infrastructure
water pump facility erection
underground drive construction
drainage pumping facility construction
infrastructure systems design
marine geophysical surveys
booster station construction
general pipeline installation
mechanical pipeline erection
civil engineering field support
site civil engineering support
subsurface geophysics advice
sewer system construction
environmental compliance consulting
geological site assessment
biological treatment plant installation
municipal sewer construction
combined sewer system build
geophysical risk consultancy
subsea distribution system
geophysical data analysis
waste & storm sewer build
sewage lift pump installation
wastewater lift station erection
pressurised line engineering
pipeline routing consultancy
municipal infrastructure support
geological risk assessment
sewage infrastructure erection
pipeline trenching for sewerage
wastewater plumbing works
wastewater purification build
sanitary drainage network build
utilities infrastructure services
sewage pumping station build
underwater structural surveys
sub-surface pump station erection
wastewater outlet structure
sewer pump station installation
ground stability evaluation
water-lift station installation
wastewater treatment infrastructure
civil infrastructure consultancy
submerged transmission line
pipeline engineering design
sewer pipeline installation
pipe system design services
sub-surface sewer installation
wastewater pumping infrastructure
wastewater conduit erection
environmental planning support
groundwater investigation
sanitation pipeline construction
water network pipeline work
road/rail/airport infrastructure advisory
borehole pump station work
sewer conduit installation
water pumping facility build
wastewater disposal pipeline works
industrial discharge tubing
energy pipe systems build
channel cleaning operations
construction environmental assessment
ground stability assessment
underground sewer conduit build
geological data interpretation
coastal wastewater outlet build
soil mechanics engineering
geological hazard assessment
wastewater gravity bypass station
general pipeline assembly
effluent transfer station
piping infrastructure design
ecological impact reviews
geophysical survey advice
urban sewage infrastructure
earth-signal interpretation
pressure booster installation
geological mapping consultancy
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :