Project Scope:

- The objective of this project is to reduce nitrogen loadings in the Teesmouth and Cleveland Coast Special Protection Area (SPA) by 1st April 2030. This will be achieved by removing the Bran Sands discharge from the River Tees and discharging directly to the North Sea to improve dispersion and dilution.

- A Long Sea Outfall for Bran Sands has been supported and approved by Ofwat in the final determination of NWG's PR24 (business plan).

- The Levelling Up and Regeneration Act (2023) requires Technically Achievable Limit of Total Nitrogen of 10mg/l at 'designated STWs' that serve a population equivalent of more than 2,000 people by 1 April 2030 and are within the Nutrient Neutrality area.

- To deliver this, the driver was included in the Water Industry National Environment Programme (WINEP) under the Habitats Directive for Nutrient Neutrality.

Project Brief - Option Detail:

- The project indicatively consists of three works packages outlined below:

- Onshore Headworks/Pumping Station

- Onshore pipeline - 3km 2m diameter

- Offshore pipeline - 4.5km 2m diameter

The packages may be tendered and awarded individually or in combination.

Types of work under the packages may include (but are not limited to):

- Design of pumped marine outfall pipeline systems

- Early Contractor Involvement and/or Works Contractor(s)

- Onshore environmental, geotechnical and geophysical surveys

- Offshore environmental, geotechnical and geophysical surveys

- Onshore tunnelling (tbc)

- Offshore tunnelling (tbc)

- Flow collection chamber/Pumping station and/or Headworks pumping station - civil, mechanical, electrical and ICA

- Dredged outfall installation - long length large diameter PE with concrete ballast

- Marine structures - outfall diffuser and diffuser protection

 

Engagement

General Information: It is mandatory for any interested suppliers to register on the new CENTRAL DIGITAL PLATFORM which is part of the enhanced Find a Tender Service (Procurement Act 2023). NWG welcomes interest from all suitable contractors / suppliers Contractors may have expertise in any of the three distinct packages of work. At this stage, NWG expect individual entity responses to this notice. Once procurement strategy has been defined, it is appreciated that delivery approaches may involve responses from JVs/Consortium Project Brief - Option Detail: The project indicatively consists of three works packages: - Onshore Headworks/Pumping Station - Onshore pipeline - 3km 2m diameter - Offshore pipeline - 4.5km 2m diameter Aims of Market Engagement: - Understand current market conditions and appetite for schemes of this nature - Understanding supplier's capability and capacity to deliver schemes of this nature - Understand and develop the procurement strategy for the project, which could include exclusive use of the Client's established framework partners or a mix of Client's framework partners and open market competition - Reviewing how work could be packaged and advertised to the market (i.e splitting into lots, advertising as one scheme etc) to deliver best value - Seeking feedback from the market to understand how NWG can be an attractive client, ensuring the procurement process is proportionate to the size and complexity of the project Market Engagement Process: - Initial Conditions of Participation to exclude any suppliers who are on Debarment List or are not registered on Central Digital Platform - Completion of contractor questionnaire via Microsoft Forms requesting information on contractor capabilities, previous experience of a similar nature, how contractors can add value to the market engagement process - NWG will review questionnaire returns and select the most suitable suppliers to attend the engagement session. Preference will be given to those suppliers with a recent demonstrable track record of delivering long length large-diameter outfall pipeline projects (or part thereof) of this nature - In-person workshop / round table session with all invited participants (expect to invite c15). Date to be confirmed to shortlisted suppliers once known - Upon completion of market engagement, the Client will develop a procurement strategy to deliver the project, if this results in an open market competition, any material shared during the engagement process will be included within the tender documents. Call to Action: Expressions of interest to complete the questionnaire must be sent to the e-mail address amp8procurement@nwl.co.uk before the deadline date of 20/08/2025 at Midday. Once the expression of interest window has closed, a link to the questionnaire will be sent to the email address you provide on 21/08/2025. The deadline for completing the questionnaire is 04/09/2025 at 5pm. When sending expression of interest, applicants must provide the following information: 1) Full company name, 2) Key contact (name, email address to receive the questionnaire link, mobile number) 3) Type of company: - D&C organisation, - Specialist service provider (please detail: eg Tunnelling (offshore/onshore)/Specialist Surveys/Marine Structures), - Other (please detail) Those suppliers selected for further engagement may be invited to an in-person workshop on Tuesday 16th September. Further details will be provided following receipt of questionnaires.

Timeline

Published Date :

4th Aug 2025 5 months ago

Deadline :

20th Aug 2025 5 months ago

Contract Start :

31st Oct 2026

Contract End :

31st Mar 2030

Tender Regions

Keywords

geology

contour mapping

rock analysis

TBM tunnelling

hydrology

subsea pipeline

waste conduits

borehole testing

sludge removal

geotech design

marine pipework

EIA consultancy

sewer pipes

sanitation lines

outfall piping

terrain analysis

seabed studies

subsea conduit

subsea mapping

bedrock analysis

tunnel shafting

tunnel boring

elevation survey

bedrock studies

oceanography

tunnelling works

soil testing

soil profiling

sewage tubing

marine science

topographic consultancy

subsurface investigation

cadastral topography

drainage pipeline works

sewer system erection

soil testing engineering

public works support

exploration geophysics

water resource studies

water treatment works

geotechnical support

fluid line installation

ground data consultancy

effluent lift works

effluent conduits

marine survey services

sewer service line build

offshore utility channel

project EIA services

geology consultancy

river discharge pipeline

foundation inspection

geotechnical assessment

municipal sewer works

sewage lift unit build

subsurface soil analysis

marine sewage outfall

stratigraphic analysis

geophysical modelling

drainage pipe erection

soil geology advisory

pipeline dredge and pump

geological assessment

sewage main laying

site topography analysis

geotechnical sampling

geotechnical drilling

urban works advisory

domestic sewage plumbing

pumping infrastructure

municipal drain build

waste-water pipework

wastewater line build

seismic interpretation

sediment analysis

geotech survey services

seismic investigation

utility water line build

pumping station build

underground drain pipes

foundation investigation

geological mapping

foul-water trench laying

hydrological research

site grading survey

geological risk advisory

sewer main laying

tunnel lining work

utility line civil works

buried utility design

geotechnical consultancy

geological surveying

sonar seabed surveys

seismic consultancy

pipeline building work

site investigation

subterrain tunnel work

geological profiling

topography data services

site impact assessment

tunnel excavation works

sewerage civil works

site geology consultancy

public works advisory

drilling geology support

sewer line construction

mineral evaluation

drainage sewer project

foul drain network build

sewage outfall build

subsurface testing

sewage disposal conduit

discharge pipelines

sewage treatment station

geoscience strategy

terrain surveying

sewer pump house works

geological exploration

treatment plant dredging

geophysics consultancy

sewage pipe build

ground condition survey

coastal hydrology

utility pumping hub

sanitary sewer build

earth science advice

sewage pipe installation

wastewater main laying

foul water piping build

land surface mapping

geophysical analysis

civil tunnelling project

geoscience consultancy

bridge support services

earthworks consultancy

civil project assistance

earth structure advice

wastewater network works

trench & pipe laying

sewer network pipework

topographic mapping

sewage pump works

broad pipeline work

rock-boring for tunnels

marine transmission line

ground survey services

treatment plant erection

sub-surface sewer work

road inspection support

offshore surveying

sewage pipeline build

sewage outlet pipes

subsurface consultancy

sediment suction works

pipeline layout planning

deepwater pipeline

structural survey

geological surveys

sewage piping works

ocean-bed pipeline

oceanographic analysis

marine inspection

dredging and pumping

sewerage infrastructure works

infrastructure planning consulting

outfall conduit construction

infrastructure project feasibility

geological advisory services

sub-surface sewage pipework

effluent handling structure

aquatic environment analysis

civil works technical assistance

treated sewage discharge works

disposal outfall infrastructure

wastewater lift plant build

pipeline technical drawings

site investigation engineering

stormwater/sewer conduit work

sewage treatment plant construction

construction EIA reporting

watercourse dredge services

sanitary pump site construction

fluid transport systems planning

water pipeline installation

sewage pump unit construction

sewage purification works

effluent discharge pipeline installation

conduit trench construction

pumping plant construction

underground sewer trenching

gas and oil pipeline design

sewer main pipeline works

sewerage network construction

pumping infrastructure build

effluent processing facility build

sanitary sewer installation

wastewater pump station build

EIA documentation services

offshore fluid conveyance

sanitation network installation

effluent lift facility build

municipal sewage pipe installation

pumping station infrastructure

fluid transport pipelaying

infrastructure engineering consultancy

sewage conduit construction

project environmental evaluation

sanitation pipe construction

wastewater pipeline build

subsurface sensing consultancy

environment discharge structure

sewage network construction

silt pumping infrastructure

water pump facility erection

underground drive construction

drainage pumping facility construction

infrastructure systems design

marine geophysical surveys

booster station construction

general pipeline installation

mechanical pipeline erection

civil engineering field support

site civil engineering support

subsurface geophysics advice

sewer system construction

environmental compliance consulting

geological site assessment

biological treatment plant installation

municipal sewer construction

combined sewer system build

geophysical risk consultancy

subsea distribution system

geophysical data analysis

waste & storm sewer build

sewage lift pump installation

wastewater lift station erection

pressurised line engineering

pipeline routing consultancy

municipal infrastructure support

geological risk assessment

sewage infrastructure erection

pipeline trenching for sewerage

wastewater plumbing works

wastewater purification build

sanitary drainage network build

utilities infrastructure services

sewage pumping station build

underwater structural surveys

sub-surface pump station erection

wastewater outlet structure

sewer pump station installation

ground stability evaluation

water-lift station installation

wastewater treatment infrastructure

civil infrastructure consultancy

submerged transmission line

pipeline engineering design

sewer pipeline installation

pipe system design services

sub-surface sewer installation

wastewater pumping infrastructure

wastewater conduit erection

environmental planning support

groundwater investigation

sanitation pipeline construction

water network pipeline work

road/rail/airport infrastructure advisory

borehole pump station work

sewer conduit installation

water pumping facility build

wastewater disposal pipeline works

industrial discharge tubing

energy pipe systems build

channel cleaning operations

construction environmental assessment

ground stability assessment

underground sewer conduit build

geological data interpretation

coastal wastewater outlet build

soil mechanics engineering

geological hazard assessment

wastewater gravity bypass station

general pipeline assembly

effluent transfer station

piping infrastructure design

ecological impact reviews

geophysical survey advice

urban sewage infrastructure

earth-signal interpretation

pressure booster installation

geological mapping consultancy

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk