TfGM is looking to establish a framework with a single contracting partner for the delivery of the next and final tranches of the Bus Depot Electrification Programme. The delivery will included both design and final construction delivery for each depot as well as any enhancement work required for existing depots already fully electrified.
Currently the designs are at RIBA stage 2 and the appointed contracting partner will progress these further to detailed design (RIBA stage 4) through to future construction, delivery and handover.
The initial programme requirements cover the design and construction at the Wigan and Wythenshawe Bus Depots. The intention is that subject to the successful delivery of both Wigan and Wythenshawe, TfGM will award further call off contracts for additional depots along with any further electrification enhancement work at depots already electrified.
The overriding objective of the new delivery model is to enable TfGM to sustainably and safely develop a range of electrical infrastructure interventions in the least disruptive manner to the ongoing operation; whilst maximising efficiency and effectiveness through innovation in relation to time, cost and quality as well as delivering tangible social value benefits withing Greater Manchester and supporting TfGM in its ambition to be a carbon neutral organisation by 2038.
Timeline
Pretender :
Published Date :
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45315400 - High voltage installation work
50113200 - Bus maintenance services
34144910 - Electric buses
63712100 - Bus station services
60210000 - Public transport services by railways
45213311 - Bus station construction work
Keywords
e-bus
brake adjustment
electric bus
fluid check
filter service
rail network service
coach station erection
passenger rail transport
transit hub operations
metro rail operations
public bus hub building
coach bay building
green fleet vehicle
HV infrastructure build
electric mass transit
bus transport facility
bus arrival coordination
zero-emission bus
urban rail provision
plug-in commuter bus
bus tire rotation
windshield wash fill
public train operations
electric public bus
bus interior cleaning
substation HV works
suburban rail service
urban electric transport
rail passenger journey
bus departure scheduling
commuter rail line
emergency kit check
chassis lubrication
emission-free transit
transit rail commuting
battery-powered coach
city rail transit
public transit bus station oversight
high voltage cable installation
bus terminal construction
intercity bus terminal support
passenger bus facility construction
bus station infrastructure
coach terminal management
utility high voltage setup
bus boarding facilitation
HV overhead line installation
intercity bus terminal build
electrical insulation works
passenger bus depot service
route-readiness inspection
regional bus hub erection
transit bus station building
bus emission compliance test
station waiting area operation
terminal passenger assistance
high voltage switchgear fitting
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :