Open Closing in a 27 days

Bus Depot Electrification Programme (Tranche 5+)

Descriptions

TfGM is looking to establish a framework with a single contracting partner for the delivery of the next and final tranches of the Bus Depot Electrification Programme. The delivery will included both design and final construction delivery for each depot as well as any enhancement work required for existing depots already fully electrified.

 

Currently the designs are at RIBA stage 2 and the appointed contracting partner will progress these further to detailed design (RIBA stage 4) through to future construction, delivery and handover.

 

The initial programme requirements cover the design and construction at the Wigan and Wythenshawe Bus Depots. The intention is that subject to the successful delivery of both Wigan and Wythenshawe, TfGM will award further call off contracts for additional depots along with any further electrification enhancement work at depots already electrified.

 

The overriding objective of the new delivery model is to enable TfGM to sustainably and safely develop a range of electrical infrastructure interventions in the least disruptive manner to the ongoing operation; whilst maximising efficiency and effectiveness through innovation in relation to time, cost and quality as well as delivering tangible social value benefits withing Greater Manchester and supporting TfGM in its ambition to be a carbon neutral organisation by 2038.

Timeline

Published Date :

1st Dec 2025 Tomorrow

Published Date :

27th Jan 2026 Today

Deadline :

23rd Feb 2026 in a 27 days

Contract Start :

31st Aug 2026

Contract End :

31st Aug 2030

Tender Regions

Keywords

e-bus

brake adjustment

electric bus

fluid check

filter service

rail network service

coach station erection

passenger rail transport

transit hub operations

metro rail operations

public bus hub building

coach bay building

green fleet vehicle

HV infrastructure build

electric mass transit

bus transport facility

bus arrival coordination

zero-emission bus

urban rail provision

plug-in commuter bus

bus tire rotation

windshield wash fill

public train operations

electric public bus

bus interior cleaning

substation HV works

suburban rail service

urban electric transport

rail passenger journey

bus departure scheduling

commuter rail line

emergency kit check

chassis lubrication

emission-free transit

transit rail commuting

battery-powered coach

city rail transit

public transit bus station oversight

high voltage cable installation

bus terminal construction

intercity bus terminal support

passenger bus facility construction

bus station infrastructure

coach terminal management

utility high voltage setup

bus boarding facilitation

HV overhead line installation

intercity bus terminal build

electrical insulation works

passenger bus depot service

route-readiness inspection

regional bus hub erection

transit bus station building

bus emission compliance test

station waiting area operation

terminal passenger assistance

high voltage switchgear fitting

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Framework

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk