Open
Cab HVAC Overhaul and Post Overhaul Repairs for the Victoria Line Fleet
Descriptions
Contract for the Victoria Line Fleet Cab HVAC Overhaul and Post Overhaul Repairs. There are 47 trains with 8 cars on the Victoria line (09TS). Each train has two cabs, one at each end. Each 09TS cab has two HVAC modules installed on the underframe on the left and right-hand side (non-driver's side and driver's side respectively, The purpose of the cab HVAC modules is to supply fresh air to the cab and maintain the thermal comfort of those in the cab, principally the train operator.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
34620000 - Rolling stock
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors