Closed
Calvert - Sheperds Furze Culvert installation and FRC works
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
High Speed 2 | MWCC C2 Calvert North Civils Work We have been appointed as Contractor (Civils) for the above project and would be pleased to receive your most competitive fixed price quotation for carrying out the subcontract works in accordance with the details and documents herein. This opportunity relates to the installation of precast items and FRC (Formwork, Reinforced Concrete) works for the Sheperds Furze Culvert. What3words location: https://what3words.com/detriment.interests.keyboards We will be letting these works under an NEC main Option B basis. For these works, Buckingham Group shall provide the following free of charge: 1. Concrete 2. Rebar 3. Fuel for Equipment on Site 4. All Precast items The successful contractor shall be responsible for design, provision and installation of all necessary Temporary Works. Design drawings can be found here: https://tinyurl.com/y9nmdk52 Subcontract Standards: https://tinyurl.com/y9nmdk52 Following responses to this CompeteFor advert, suppliers will be shortlisted and successful suppliers will be invited to a competitive tender for the works and services whereby final selection will be based upon a balanced scorecard assessment. The criteria of this assessment will consider quantitative and qualitative evidence supplied by tenderers. Our company history dates back to the formation of Buckingham Plant Hire in 1955, with Buckingham Group Contracting Ltd being formally incorporated in November 1987. The company has grown organically to become a highly established Main/Principal Contractor, providing a range of stand-alone or fully integrated services in Civil Engineering, Building, Sports & Leisure, Demolition, Land Remediation/Restoration, and Rail.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
RCC building
reinforced-concrete work
under-road water channel
storm-drainage structure
RC skeleton erection
RC structure erection
culvert construction
drainage culvert build
structural RC framing
RC building framework
rebar concrete structure
storm-water culvert erection
steel-concrete composite construction
concrete beam and column work
load-bearing concrete structure
road culvert installation
structural concrete build
watercourse culvert build
concrete superstructure work
reinforced concrete shell build
reinforced concrete structure build
bridge-like drainage culvert
concrete core construction
concrete frame construction
reinforced slab construction
high-strength reinforced concrete work
hydraulic culvert construction
seismic RC structure build
structural drainage crossing
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :