Awarded
Capital Investment Works - 2026 to 2046
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Southern Housing are seeking to procure up to 10 contractors to deliver Capital Investment Works across 10 operational Lots, 4 Lots for External elements (Windows, Roofs and non-fire Doors plus associated works) and 6 Lots for Internal elements (Kitchens and Bathrooms plus associated works) split on a geographical basis. The contracts also include provision for the following works to be included where required
to the properties receiving Capital Investment Works to maximise efficiency of delivery and minimise disruption to residents:
a) Fire safety works (only within the primary area of component renewal)
b) Retrofit works (non-SHDF/WH: SHF etc.)
and Bidders will be required to have the capability to fulfil the following roles in support of the contract delivery:
a) Legal responsibility of Principal Designer and Principal Contractor roles under CDM
b) Legal responsibility of Principal Designer and Principal Contractor roles under Building Safety Act requirements
c) Quality assurance of work delivered by the contractors with provision of supporting evidence.
As a contingency only, Bidders are also requested to price for the provision of asbestos surveying and removal works. This is to be provided in strict accordance with Southern Housing procedures and only when specifically instructed by Southern Housing.
In accordance with section 52 of the Procurement Act 2023, wherever the Client enters into a public contract with an estimated value of
more than £5 million, the Client must set and publish at least three key performance indicators in respect of the Contract.
In light of the estimated value of the Contract, the Client has set the following indicative key performance indicators for the purposes of
this procurement:
KPI 1 - Performance Against Programme
KPI 2 - Resident Satisfaction
KPI 3 - Achieving Budget
KPI 4 - Defects at Handover
The contract extension options will be linked to performance and a programme of market testing as set out in the Invitation to Tender.
This serves as a longer-term incentive and establishes testing of ongoing value for money.
The Client will enter into Contract with the with the successful Contractor(s) which shall be based on the NHF Form of Contract 2023
(including a Schedule of Amendments).
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
51120000 - Installation services of mechanical equipment
45343000 - Fire-prevention installation works
71630000 - Technical inspection and testing services
39141000 - Kitchen furniture and equipment
45450000 - Other building completion work
45330000 - Plumbing and sanitary works
71530000 - Construction consultancy services
51110000 - Installation services of electrical equipment
90650000 - Asbestos removal services
45310000 - Electrical installation work
45440000 - Painting and glazing work
45430000 - Floor and wall covering work
45350000 - Mechanical installations
45420000 - Joinery and carpentry installation work
45410000 - Plastering work
45320000 - Insulation work
45211000 - Construction work for multi-dwelling buildings and individual houses
Keywords
family homes
building wiring
housing projects
low rise flats
gearbox coupling
fitted kitchens
plumbing work
plastering work
pipe fittings
kitchen shelving
insulation work
conduit routing
kitchen cabinets
cable routing
finishing trades
painting work
kitchen units
glass fitting
tender document drafting
meter board assembly
compliance auditing
energy loss reduction
window glazing fitting
mechanical system setup
clustered housing
testing verification
domestic dwellings
apartment building works
lifecycle cost analysis
woodwork installation
fire door installation
smoke curtain fitting
circuit installation
final touch trades
internal power grid
wall smoothing plaster
buildability assessment
pump skid installation
sanitary installation
conformity evaluation
render application
safety inspection
performance validation
structural wood fitting
heat barrier fitting
drainage system assembly
interior painting
nondestructive testing
residential units
glazing installation
cost control strategy
lighting and power setup
kitchen furniture
quality verification
asbestos remediation
building completion work
machinery mounting
gear reducer mounting
wiring connection
schedule simulation
gypsum finish work
site access planning
circuit breaker setup
pre-tender consultancy
cable tray installation
carpentry fitting
cookroom furnishings
asbestos fiber cleanup
electrical installation
technical inspection
domestic buildings
asbestos abatement
compressor base leveling
belt conveyor setup
individual housing
functional auditing
skidding system assembly
plant equipment installation
electrical infrastructure
electrical connection works
temporary power feed setup
construction optimization analysis
outlet and switch fitting
mechanical equipment commissioning
grounding rod installation
distribution board alignment
structural integrity checks
completion of interiors/exteriors
hydraulic press installation
asbestos demolition support
electrical network installation
floor and wall covering work
mechanical installation work
joinery installation work
surface finish installation
technical advisory services
electrical systems fitting
fire prevention installation
stakeholder requirement alignment
procurement strategy advice
building hazardous cleanup
building handover preparation
flooring and wall surfacing
electrical panel mounting
value engineering assessment
Construction structures and materials
friable asbestos extraction
sustainability compliance planning
protective hazmat removal
interior surface finishing
thermal insulation installation
building envelope insulation
hazardous dust elimination
certified asbestos disposal
project viability appraisal
sanitary fixture installation
hazardous material removal
flame barrier system setup
mechanical anchor bolting
machine foundation alignment
decorative surface coating
construction logistics analysis
multi dwelling construction
modular kitchen furniture
Tender Lot Details & Award Criteria
10 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :