Awarded
Combined Heat and Power Unit (Falmer Sports Centre) Energy Performance Contract
Descriptions
The University of Brighton owns a Tedom small-scale gas engine combined heat and power (CHP) unit intended to serve the Heating Plant Room, Brighton Sport & Health Complex, Falmer Campus, Brighton, East Sussex, BN1 9PH. Specifically the CHP unit concerns a 1No. Tedom Cento T100 Natural Gas, Sound Enclosure. 50 Hz, (Manufactured in 2012).
There is an intention to install this CHP unit at the Falmer facility and operate it to produce low-cost electricity, free heat, and play a role in the sustainability agenda of the University.
The University is looking to assign an Energy Performance Contract to an Operator. This will specifically involve the Operator purchasing and operating the CHP unit for the sole purpose of selling the University heat and power throughout the system's 15-year operational life.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
South East
CPV Codes
71323100 - Electrical power systems design services
65410000 - Operation of a power plant
Keywords
power station management
energy generation facility
electricity production
plant operation services
turbine control
boiler operation
electrical output management
thermal plant running
energy plant maintenance
power infrastructure operation
power system design
electrical grid planning
substation design engineering
power distribution layout
electrical network consultancy
switchgear engineering
renewable grid design
power infrastructure planning
electrical utility design
power system integration services
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors