Open Closing in a 11 days

Construction and commission of modular rig

Descriptions

UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network 1. Project Overview UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. ________________________________________ 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network Installation Verification • Completion of installation checks against drawings and specifications • QA/QC inspections and documentation • Identification and resolution of defects or non-conformances • As-built documentation and redlining Inactive Commissioning • Mechanical completion checks • Pressure/leak testing (where applicable) • Functional checks (non-energised / non-process) • Safety and compliance verification • Handover documentation and commissioning packs ________________________________________ 3. Contractor Requirements Interested parties should demonstrate: • Experience assembling modular or multi-storey industrial/process rigs or plant • Experience working with multi-disciplinary service interfaces (gas, fluids, extraction, electrical) • Commissioning and mechanical completion experience • Strong health, safety, and quality management systems to comply with CDM regulations • Ability to work within an operational facility environment • Relevant certifications and competencies ________________________________________ 4. Deliverables The appointed contractor will be expected to provide: • Method statements and risk assessments • Installation and commissioning plans • Inspection and test records • Mechanical completion dossiers • As-built documentation • Handover pack ________________________________________ 5. Programme (Indicative) • Site readiness: June 2026 • Assembly period: 3 months • Handover to active commissioning: September 2026

Engagement

This exercise is an Expression of interest and is part of a pre-tender market consultation, it does not constitute a formal procurement process. The purpose of this exercise is to assess the capabilities within current markets to delivery this service. Company Name :United Kingdom National Nuclear Laboratory Delivery address: Springfields, Salwick, Preston, Lancashire. PR4 0XJ Contact :Procurement@uknnl.com Opportunity to attend site for pre-tender engagement will be provided depending on EOI received

Timeline

Published Date :

9th Feb 2026 Today

Deadline :

20th Feb 2026 in a 11 days

Contract Start :

31st May 2026

Contract End :

30th Sep 2026

Keywords

on-site assembly

public works

building sites

structural work

renovation work

site construction

equipment alignment

infrastructure projects

construction work

construction services

civil engineering

control panel setup

mechanical anchor setup

hardware commissioning

fixture installation

non-software integration

building construction

structural bracket installation

piping system installation

lighting fixture mounting

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk