Awarded
Coring and testing of George St. Bridge Approach Spans for Assessment
Descriptions
George St Bridge has recently failed an assessment and the weight limit has been reduced to 7.5T until further core sampling can take place to identify the true loading potential of the approach spans. This may identify that strengthening work will be required before other maintenance schemes can be started.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71631450 - Bridge-inspection services
Keywords
bridge safety audits
structural resonance testing
span integrity assessment
load‑bearing evaluation
corrosion detection
expansion joint inspection
deck wear measurement
pier soundness testing
structural vibration analysis
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors