Open
Criterion Quay Flow Development Design and Construct Works Package
Descriptions
We envisage this will be a contract let in one lot for the design and construction of the items listed in the introduction above. The contractor’s designer will need to submit all aspects of the design for an independent check. Construction aspects will include land remediation, strengthening and surfacing, an over water jetty, rock and sediment dredging, reclamation (with beneficial use of the dredged rock) and either sheet piling and/or a rock revetment to contain the reclaimed area. There will be a new access into the site from an existing road and there will be security gates and fencing surrounding the site.Dredging activity will be included within the works contract.M&E works will include site distribution of 3phase electrical power, water supplies and perimeter lighting. It is expected there will be limited requirements for water supplies to serve temporary offices, together with associated foul sewerage. Surface water drainage will be required to all non-porous areas.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
Wales
CPV Codes
45244000 - Marine construction works
Keywords
marine construction
offshore infrastructure
maritime civil works
underwater engineering
sea structure build
coastal marine works
marine piling
aquatic construction
submerged structure erection
port marine projects
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors