Open Closing in a 1 month

Cutty Sark - Fall Prevention System

Descriptions

1.Royal Museums Greenwich (RMG) constitutes several Sites and Buildings across a large area within the Royal Borough of Greenwich. They encompass the National Maritime Museum (NMM), the Royal Observatory (ROG), the Cutty Sark (CS), and the Queen's House (QH). These four world-class attractions sit at the heart of Maritime Greenwich in a UNESCO World Heritage Site.

2.Cutty Sark is a celebrated historic sailing ship launched 1869 and was fastest tea clipper of its time, it is now an award-winning visitor attraction in Greenwich, London. It is managed and maintained by Royal Museums Greenwich, who are based at the National Maritime Museum.

3.The dry dock on the bank of the River Thames at Greenwich received Cutty Sark by water in 1954. The dry dock was drained and Cutty Sark exhibited in the open air until its restoration 2006-2012 when it was enclosed around the waterline with a glass roof. The dry dock became a basement where visitors can walk around and under the ship's hull and which holds a café, exhibitions and events space.

4.Cutty Sark requires regular cleaning, maintenance and conservation. Many of the required activities must be undertaken from on top of the glass waterline roof. These activities might be cleaning the glass roof itself, ship exterior inspections, conservation and repairs, or replacements of hull timber planks individually or in sections.

5.The work requires access onto the roof which creates a work-at-height issue. A Fall Prevention (Latchway) System is required for the safety of workers. An existing installed system is aged and can no longer be proven to comply with evolving regulations.

6.A replacement of the Fall Prevention System is required to be designed, fabricated and installed by the Contractor. This will be the Contractor's design responsibility under this design and build contract. The system must be fitted to the historic ship's hull which will require collaboration with the Employer's appointed Structural Engineer and conservation team.

7.RMG seeks contractors who are accredited / approved fall arrest and prevention designers and installers to carry out this work.

8.The works must be completed by 31st March 2026.

For more information about this opportunity, please visit the Delta eSourcing portal at:

https://www.delta-esourcing.com/tenders/UK-UK-London:-Safety-installations./62A849C75T

To respond to this opportunity, please click here:

https://www.delta-esourcing.com/respond/62A849C75T

Timeline

Published Date :

14th Aug 2025 Yesterday

Deadline :

17th Sep 2025 in a 1 month

Contract Start :

12th Oct 2025

Contract End :

31st Mar 2026

Tender Regions

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors