Awarded
DE2957529 Appointment of an IST for New-Bridge Integrated College Loughbrickland
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The project is for the design, supply, delivery, receiving, off-loading, setting into position, fixing, erection, building testing, commissioning and finishing in every respect of the new Post-Primary School for 670 pupils to include external hard play, synthetic and grass pitches, tennis courts, Sports Hall, School Meals Accommodation, car and bus parking and drop-off and a new entrance onto Donard View Road. The design has been completed to RIBA Stage 3. The successful IST will be responsible for completing RIBA Stage 4 onwards. It is proposed to construct the new school on the existing site with the grass pitches being developed on a newly purchased site adjacent to the existing. There are no established site services on the additional site. The main school building will be located on the middle portion of the site slightly further back on the site than the current main building of the School. It is anticipated that extensive phasing will be required with the school remaining fully operational during the construction period. By facilitating a phased development, a portion of the new school buildings are constructed on part of the footprint of the existing school buildings. This allows for a more efficient use of the site with no diversion of the mains sewer necessary. The estimated programme for the construction period is of the order of 30 months (overall incl pre-construction is 35 months approx). Full details will be provided in the ITT documentation.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45214220 - Secondary school construction work
45210000 - Building construction work
45214200 - Construction work for school buildings
45351000 - Mechanical engineering installation works
45310000 - Electrical installation work
Keywords
masonry
general building
building wiring
new buildings
cable routing
superstructure
residential construction
circuit installation
internal power grid
architectural building
senior high school build
structural construction
lighting and power setup
junior high construction
shell construction
school hall build
high school construction
secondary school build
secondary campus build
building erection
electrical installation
scholastic infrastructure build
secondary academic premises
public school plant build
electrical infrastructure
electrical connection works
school building construction
process equipment fitting
school campus construction
secondary education center
electrical network installation
middle school facility erection
primary/secondary school build
electrical systems fitting
heavy machinery integration
mechanical engineering installation
high-grade classroom building
commercial building works
educational building erection
precision plant installation
educational premises erection
classroom complex construction
high-level school structure
school environment construction
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :