Awarded
Design and Construction of New Fire Engine Shed at IWM Duxford
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Imperial War Museums ("IWM") invites tenders from suitably qualified contractors to undertake the Design & Build of a new Fire Engine Shed at IWM Duxford, adjacent to the existing Air Traffic Control (ATC) Tower. The facility will serve as a modern operational hub for fire response, equipment storage, and personnel readiness. The design must be utilitarian and robust, with low maintenance requirements, while incorporating heritage-style features and a colour palette that complements surrounding historic buildings. The structure will be compact yet fully functional, delivering cost-effective value in line with public sector expectations.
The shed must not obstruct sightlines from the Visual Control Room, nor exceed the height or footprint of the ATC Tower. A physical separation between the new building and the tower is required for operational and fire safety compliance.
Internally, the shed will house three fire vehicles with appropriate spacing, automatic emergency doors, exhaust extraction, and durable flooring. It will also include storage for fire PPE, relocated washing machines, breathing apparatus equipment, and other essential services.
Support facilities will comprise a breathing apparatus room with water supply, workbench, and extraction systems; decontamination showers with changing areas and lockers; a changing room with heating, filtration, and drying provisions; and a washing machine room with drying space and ventilation. A watch room will provide CCTV coverage of movement areas.
External works will include a floodlit vehicle access zone, direct links to taxiways, security measures such as bollards and optional CCTV, and appropriate drainage systems. Access improvements and lighting upgrades are also planned.
Construction is scheduled to begin in January 2026, with completion targeted for July 2026. Contractors must adhere to strict airside safety protocols, maintain a clean site, and address environmental factors.
The design must ensure no visual obstruction, match the ATC tower's dimensions, and support future operational upgrades, including CAT 7 compliance.
Access Code : 43Q8JP8P9B
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=1004593960
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
masonry
general building
firehouse build
new buildings
superstructure
residential construction
architectural building
fire operations centre
fire engine depot build
fire safety centre
structural construction
fire services building
shell construction
project design advisory
conceptual engineering
building erection
fire response HQ build
civic protection infrastructure
security & emergency building construction
firefighting facility construction
engineering blueprint consultancy
multidisciplinary engineering planning
emergency services complex
engineering drafting services
technical design solutions
defence installations build
justice & security building erection
fire brigade station construction
commercial building works
military structure erection
public safety building works
engineering specification services
emergency operations buildings
armed forces facility construction
technical design services
fire rescue station construction
law enforcement facility build
system design engineering
engineering design consultancy
firefighter hall erection
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :