Closed
DHDA PSDP 1 - Multi Supplier Framework Agreement for the provision of Project Supervisor Design Process (PSDP) Consultancy Services
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The Contracting Authority proposes to establish a Multi-Party Framework Agreement for 4 years from commencement with the Contracting Authority having the option of extending the agreement for further periods of two (2) years, and a further one (1) year, subject to the satisfactory performance of the tenderer.Project Supervisor Design Process (PSDP) Consultancy services are anticipated to support works involving repairs and refurbishment of existing buildings, including protected structures. However, over the course of the Framework other projects may be required including new or replacement buildings and structures.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71317210 - Health and safety consultancy services
71500000 - Construction-related services
71530000 - Construction consultancy services
71318000 - Advisory and consultative engineering services
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services
Keywords
H&S consultancy
facility design
hazard analysis
technical design
surveying
tender document drafting
professional engineering
engineering expertise
lifecycle cost analysis
scaffold planning
construction logistics
engineering consultancy
buildability assessment
design review services
safety program design
safety systems advisory
cost control strategy
structural engineering
waterproofing services
civil engineering
construction consultancy
planning consultancy
engineering advisory
systems consultancy
technical consultancy
schedule simulation
site clearing services
earthworks services
site access planning
utilities trenching
pre-tender consultancy
architectural services
inspection services
building engineering
site utilities installation
heavy equipment operation
specialist engineering support
technical engineering provision
construction optimization analysis
occupational health consulting
engineering project advice
access infrastructure services
engineering feasibility advisory
technical problem-solving
temporary facilities setup
health risk mitigation consulting
engineering project support
technical advisory services
industrial hygiene advice
technical engineering solutions
stakeholder requirement alignment
procurement strategy advice
workplace safety strategy
value engineering assessment
multidisciplinary engineering
sustainability compliance planning
safety management consulting
engineering strategy services
pre-construction services
building construction support
expert engineering services
project viability appraisal
specialist engineering services
expert engineering consultancy
noise control implementation
construction logistics analysis
regulatory compliance advisory
modular construction support
structural framework setup
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :