Awarded
DPR60 Turbine Fabrication Servic - Fabrication of steel support shaft and hubs for vertical access turbine
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
DesignPro requires the fabrication of 2 X shaft + hub assemblies to support its vertical access hydrokinetic turbine. The units to be built are large steel structures that require precision machining and subsequent precision assembly of these components by welding and bolting. There is a short fabrication time frame required to meet company deadlines. The units must be completed and ready for collection by mid - September 2019. The overall dimensions are 6 meters tall and 2.5 meters wide. The central shaft is a 270 mm steel heavy wall pipe that must be worked on a lathe. The maximum diameter to be worked is 625 mm.There are two steel hubs 2.5 M in diameter that must be precision machined. High strength welding is required during assembly.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
auxiliary unit
bespoke machinery
automation module
production system
multipurpose device
industrial subassembly
non-standard machines
modular equipment
special-purpose equipment
custom industrial machinery
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :