Closed
Ductless Laboratory Cabinets
Descriptions
The Contracting Authority requires the supply and installation of 32 ductless laboratory cabinets (including maintenance during their expected life) and the decommissioning of existing cabinets. , The required products are as follows;, 17 x 800mm wide ductless fume cabinets, 1 x 1800mm wide ductless fume cabinets, 14 x 1200mm wide bio-safety cabinets - Class II, Decommissioning must be managed to ensure minimal operational impacts to the Contracting Authority and will be carried out in a manner which ensures the ethical and safe disposal of the 32 existing Labcaire (+) ductless fume hoods and class II biologic safety cabinets which have reached their end of life., In commissioning / decommissioning the Supplier will;, - Deep clean new equipment in accordance with UKAS ISO 17025 accredited practices, following delivery., - Deep clean and prepare the Authority's premises (in accordance with ISO17025) in conjunction with the Authority's staff. , - Decontaminate (sterilise) current equipment prior to removal., - Manage removal of current equipment and suitable disposal in accordance with relevant Environmental regulations., - Install new equipment, calibrate and certify to ensure compliance with the BS EN standards specified below., - Provide equipment awareness and training to the Authority's staff for up to 25 people., Standards, 1. Cleaning in accordance with IS017025 (equipment and premises), 2. The Supplier will ensure all cabinets are compliant to the Control of Substances Hazardous to Health Regulations 2002 and should be maintained as follows:, Microbiological Safety Cabinet: The following testing procedures are in accordance with BS EN 12469:2000, Recirculating Fume Cabinet: The following testing procedures are in accordance with BS EN 7989:2001, Ducted Fume Cupboard: The following testing procedures are in accordance with BS EN 14175., Maintenance and repair will be provided in compliance with the following timescales;, The Supplier shall resolve equipment issues within 2 Working Days of being notified of the issue by the Authority. , The Supplier shall maintain sufficient parts kept in stock so the cabinet could be put back into service as soon as a possible to minimise operational impact to the Authority., The Supplier will provide consumable filters every two (2) years, if not required sooner.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
39180000 - Laboratory furniture
98391000 - Decommissioning services
Keywords
laboratory furniture
lab benches
fume hood fittings
lab storage cabinets
chemical-resistant worktops
scientific work tables
lab seating systems
laboratory apparatus installation
analytical instrument fitting
biosafety cabinet setup
pipette calibration device installation
spectrometer mounting
centrifuge system integration
chromatography equipment fitting
lab automation installation
testing bench setup
chemical analysis device integration
site dismantling
plant decommissioning
apparatus shutdown
hazardous material clearing
facility deactivation
structural removal
equipment disposal
environmental remediation
safe demolition
asset retirement
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors