Closed

Ductless Laboratory Cabinets

Descriptions

The Contracting Authority requires the supply and installation of 32 ductless laboratory cabinets (including maintenance during their expected life) and the decommissioning of existing cabinets. , The required products are as follows;, 17 x 800mm wide ductless fume cabinets, 1 x 1800mm wide ductless fume cabinets, 14 x 1200mm wide bio-safety cabinets - Class II, Decommissioning must be managed to ensure minimal operational impacts to the Contracting Authority and will be carried out in a manner which ensures the ethical and safe disposal of the 32 existing Labcaire (+) ductless fume hoods and class II biologic safety cabinets which have reached their end of life., In commissioning / decommissioning the Supplier will;, - Deep clean new equipment in accordance with UKAS ISO 17025 accredited practices, following delivery., - Deep clean and prepare the Authority's premises (in accordance with ISO17025) in conjunction with the Authority's staff. , - Decontaminate (sterilise) current equipment prior to removal., - Manage removal of current equipment and suitable disposal in accordance with relevant Environmental regulations., - Install new equipment, calibrate and certify to ensure compliance with the BS EN standards specified below., - Provide equipment awareness and training to the Authority's staff for up to 25 people., Standards, 1. Cleaning in accordance with IS017025 (equipment and premises), 2. The Supplier will ensure all cabinets are compliant to the Control of Substances Hazardous to Health Regulations 2002 and should be maintained as follows:, Microbiological Safety Cabinet: The following testing procedures are in accordance with BS EN 12469:2000, Recirculating Fume Cabinet: The following testing procedures are in accordance with BS EN 7989:2001, Ducted Fume Cupboard: The following testing procedures are in accordance with BS EN 14175., Maintenance and repair will be provided in compliance with the following timescales;, The Supplier shall resolve equipment issues within 2 Working Days of being notified of the issue by the Authority. , The Supplier shall maintain sufficient parts kept in stock so the cabinet could be put back into service as soon as a possible to minimise operational impact to the Authority., The Supplier will provide consumable filters every two (2) years, if not required sooner.

Timeline

Published Date :

4th Jan 2022 3 years ago

Deadline :

25th Jan 2022 3 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

laboratory furniture

lab benches

fume hood fittings

lab storage cabinets

chemical-resistant worktops

scientific work tables

lab seating systems

laboratory apparatus installation

analytical instrument fitting

biosafety cabinet setup

pipette calibration device installation

spectrometer mounting

centrifuge system integration

chromatography equipment fitting

lab automation installation

testing bench setup

chemical analysis device integration

site dismantling

plant decommissioning

apparatus shutdown

hazardous material clearing

facility deactivation

structural removal

equipment disposal

environmental remediation

safe demolition

asset retirement

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors