Closed
EICR Testing
Descriptions
NHS Lothian utilises SFG 20 to determine suitable workplaces and schedules. Work plan ‘44-11 & SHTM 06-23 – Period Inspection and Testing’ defines the requirements of this service.. Each distribution board shall be subject to 5 year inspection and test. There will be occasions where power cannot be removed from Distribution Boards due to clinical risk. If this event exists, then there is a requirement to carry out Thermal Imaging of Electrical Systems (under 1000VAC) SFG Work plan 44-16 with Earth Loop Impedance test. Prior to this change being implemented it must be agreed by Head of Estates and Hard FM Area Manager and recorded through contract governance. The SFG 20 work plan is contained within the suite of procurement documents available for download on PCS-Tender.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
switchgear diagnostics
circuit breaker calibration
busbar inspection
panel wiring repair
protective relay testing
transformer enclosure service
load balancing test
fuse replacement
fault current testing
distribution board overhaul
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors