Open Closing in a 1 month
Electrical Testing (EICR and Remedials) Service
Descriptions
North Star Housing Group is inviting tenders from qualified and experienced service providers to deliver a comprehensive programme of:
Electrical Installation Condition Reports (EICR) on a 5-year cyclical basis, including all associated C1 and C2 remedial works, Portable Appliance Testing (PAT) on a programmed/cyclical basis, across domestic and non-domestic properties within our property portfolio in the Tees Valley, North Yorkshire, and County Durham.
These services are essential to maintain the safety and compliance of our housing stock, in line with all applicable statutory and regulatory standards.
1. Electrical Installation Condition Reporting (EICR)
Inspection and testing of domestic, communal, and commercial electrical installations in accordance with the latest edition of BS 7671 and Guidance Note 3.
Completion of full EICRs and electronic submission of reports within 5 working days of testing.
Testing to include all necessary checks (e.g. polarity, insulation resistance, earth fault loop impedance, continuity, etc.) and a visual photographic record of the consumer unit.
Testing of smoke/CO alarms, extractor fans, and mechanical extraction systems.
Completion of all C1 and C2 remedial works at the point of inspection, resulting in a "SATISFACTORY" outcome.
Servicing of various property types, including:
Domestic (occupied and void)
Communal areas (low and high-rise)
Sheltered schemes
Commercial/office spaces
2. Portable Appliance Testing (PAT)
PAT testing of all relevant portable electrical appliances, conducted in line with:
The Electricity at Work Regulations 1989
The IEE Code of Practice for In-Service Inspection and Testing
Testing of all applicable equipment including white goods, IT devices, portable/fixed plug-top appliances.
Digital record of each tested appliance to include: asset ID, date, tester's signature, pass/fail status, and next test due date.
Clear labelling of all items tested, with failed appliances to be removed or repaired and retested.
Access and Engagement
North Star will provide access contact information and support for scheduling. Contractors must demonstrate effective first-time access protocols, including:
Initial contact 60-120 days before test due date
Follow-up letter schedule and escalation to North Star where access is not gained
Documented proof of communication attempts retained
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71314100 - Electrical services
73430000 - Test and Evaluation
Keywords
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors