Closed
Expression of Interest to act as principal contractor for this part of the project which forms a part of re-servicing of the site with wholesome water supply, fire hydrant supply and new H.V. electrical supply to facilitate complete separation from the Royal Derby Hospital site.
Descriptions
Ground Works to form and cast a reinforced concrete base, with retaining walls, including cable ducts Construction of a heavyweight building, to house a standby generator complete with acoustic treatment. The installation of a bulk oil storage tank complete with controls and pipework to generator set. Installation of a new BMS control system to monitor generator and oil systems and interface with the site BMS including connection to the Trust's HQ central BMS with additional graphics. New Low Voltage electrical distribution between generator and new Low voltage connection into the building, to replace existing electrical supply, including installation of new Low voltage power cables between the generator house and the existing intake switchboard within the Radbourne unit. Dis-connection and removal of existing electrical supply and isolation from the main hospital supply (will require cooperation of the hospital during this work Miscellaneous local electrical supplies within the locality of the generator house
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors