Open Closing in a 1 year
FDIS - Lichfield Fire Compartmentation Works - FY2025/26 - Amey Central - West
Descriptions
Central Region - West
Brief scope of works:
1. Accredited professional to gain access to the roof spaces and carry out a thorough and comprehensive inspection of the roof space to ensure adequate compartmentation exists between flats and/or buildings. The only access currently is through the domestic flats themselves. Lack of compartmentation is a critical fire safety feature designed to prevent the spread of fire and smoke between different areas of a building. Without confirmation of sufficient compartmentation, there is a heightened risk that a fire could spread rapidly, endangering the lives of residents.
2. Block of Flats 1 - Fill the compartmentation breach within the ground floor gas services cupboard with the correct fire stopping product IAW DIO TS 2022-02 (attached)
3. Block of Flats 2 - Fill the compartmentation breach within the ground floor gas services cupboard with the correct fire stopping product IAW DIO TS 2022-02 (attached)
4. Block of Flats 3 - Fill the compartmentation breach within the ground floor gas services cupboard with the correct fire stopping product IAW DIO TS 2022-02 (attached)
Amey have been tasked by the DIO through the FDIS to deliver the RAMS for the Central and North Regions.
This notice is a call for competition and there may not be a further notice related to this opportunity.
For Amey to accept any EoI it is ESSENTIAL that any subcontractor is:
• willing to act as Main Contractor (essential requirement);
• a Verified member of Constructionline (GOLD), relevant Work Category MUST show that Subcontracting is possible, and the 'Building Safety Act - Standard Construction' must be Verified;
• capable of working to MOD SFG20 (PPM works only);
• capable of working in a BIM Level 2 environment (where applicable);
• compliant with DefStan 05-138 (required if you are likely to handle MoD Identifiable Information on your IT system);
• willing to work with Amey to deliver Social Value to our Client; ideally, complete the Social Value Goal within the Constructionline platform.
DESIRABLE attributes of our Supply Chain:
• have a CSR policy;
• have a Bus Cont & Disaster Rec'y Plan
If successful the subcontractor will need to pass a PQQ, sign up to Amey Terms and Conditions, and meet the MoD Security Requirements.
This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY.
Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch).
Note 1: The bidder must quote for all aspects of the Works.
Note 3: Those making an EoI will be required to sign-up to our 'Sub-contract Agreement'
This opportunity is also advertised on Constructionline.
ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45343000 - Fire-prevention installation works
Keywords
fire‑prevention installation
smoke curtain fitting
fire door installation
flame barrier system setup
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors