Open Closing in a 8 months
Fire Risk Assessment Remedial Works
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Great Places Housing Group (GPHG) intends to establish a standard framework of one or more lots, with a number of suppliers in each lot for the provision of remedial works as required by our ongoing programme of Fire Risk Assessments. This will principally be for passive firestopping works, such as fire door installation & compartmentalisation, but may include some elements of active fire risk prevention.
Works will be carried out across the GPHG estate in Greater Manchester, Cheshire, Lancashire, High Peak & South Yorkshire.
The Framework is envisaged as lasting four years and will be for a value of up to £5 million.
Telephone number removed
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45343000 - Fire-prevention installation works
35111500 - Fire suppression system
45453100 - Refurbishment work
45421100 - Installation of doors and windows and related components
45421131 - Installation of doors
44221220 - Fire doors
45410000 - Plastering work
45421152 - Installation of partition walls
45312100 - Fire-alarm system installation work
45421141 - Installation of partitioning
Keywords
fireproof doors
fire-rated doors
safety doors
fire exit doors
door fitting
plastering work
frame fitting
fire doors
evacuation alert system
sprinkler systems
office partition setup
intumescent doors
cosmetic renovation
fire door installation
smoke curtain fitting
fire protection systems
wall smoothing plaster
building overhaul
rated door assemblies
render application
door hardware fitting
fire suppression system
heat sensor wiring
glazing component setup
refurbishment work
smoke detector fitting
structural refurbishment
fire compartment doors
fire-resistant doors
flame-resistant doors
fire-alarm installation
partition installation
door installation
threshold installation
gypsum finish work
gas suppression systems
fire system units
fire safety network
hinged door mount
automatic fire suppression
interior/exterior door install
emergency suppression systems
automatic fire signal system
fire extinguishing system
fire prevention installation
alarm control panel fitting
non-loadbearing wall build
movable partition fitting
interior/exterior renewal
partition wall installation
internal partition fitting
fire suppression installation
demountable partition fitting
installation of doors and windows
flame barrier system setup
room divider installation
wool/acoustic wall install
emergency alarm installation
building fire alarm works
suppression control equipment
fire detection system setup
Tender Lot Details & Award Criteria
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :