Closed
Fire Strategies
Descriptions
The requirement is to produce comprehensive ‘Fire Strategy’ reports for specific existing buildings listed within this document at HMNB Portsmouth and its surrounding sites. Important: An NDA will be issued as part of this Tender pack. The suppliers will be required to sign and return the NDA before the Statement of Requirements documents are issued to them. Important: The fire strategists shall be qualified as follows: • Degree qualified and be Members or Fellow Members of the Institute of Fire Engineers, with professional qualifications. • Minimum of 10 years’ experience in the field of ‘Fire Strategy’ reporting based on existing buildings. • Experience in the production of Fire Strategies for Complex and High rise buildings (HRBs). Site visits are scheduled from the 20th of January through the 23rd of January.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Tender Lot Details
1 Tender Lot
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors