Closed
Fosse Way Pitch
Descriptions
1. To form a medium duty path along the line of the attached plan. (Approximately 450m) 2. Finished pathway to be a minimum of 1200mm width 3. Dig out the path width to a depth of 150-200mm and move the excess spoil to a location at the east end of the site. The path will need to be dug out for the entire length. Existing surface is topsoil with grass cover. 4. Relocate excavated topsoil of the East end of the site and form into flat topped bund of maximum area and minimum height as per drawing. Weed treat and seed on completion. 5. Install rot treated timber edging, securely anchored to prevent displacement. 6. Lay fabric weed control and stabilisation layer. 7. Supply lay and compact 100mm min thickness base layer comprising crushed brick, crushed concrete or MOT approved stone material with a 50mm to zero granule size. 8. Provide and lay an asphalt wearing coarse comprising a 60mm base layer and a 20mm fine surface layer. Hot rolled and compacted ensuring a slight crowned centre o aid drainage. 9. Merge and feather new pathway to existing path at two points indicated on the plan.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45112500 - Earthmoving work
45112712 - Landscaping work for gardens
45112710 - Landscaping work for green areas
45113000 - Siteworks
45112711 - Landscaping work for parks
Keywords
Tender Lot Details
2 Tender Lots
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors