Full Scale Mooring Test Line Rig ORE/23/089
Descriptions
This tender is being issued by the Offshore Renewable Energy Catapult ('ORE Catapult') as a competitive procurement exercise in accordance with the 'Competitive Procedure with Negotiation' for tendering under the Public Contracts Regulations 2015 (as amended from time to time).
ORE Catapult intends to expand its cable testing capabilities by appointing a single contractor (or consortium) to design and construct Full Scale Mooring Test Line Rig at its National Floating Offshore Wind Innovation Centre (FLOWIC) site in Aberdeen.
ORE Catapult reserve the right to vary the Contract term following discussion with suppliers during the Competitive Procedure with Negotiation process.
ORE Catapult reserve the right to add additional requirements to the minimum Scope of the Works during the Contract life, as it is deemed appropriate within the Scope of the Works.
Phases of the procurement process:
Stage 1 - Selection Questionnaire to a minimum of 3 (three) capable suppliers, where there are less than 3 (three) capable suppliers, all suitably qualified tenderers will be invited to proceed to Stage 2.
Stage 2 - Non-Disclosure Agreement (NDA). Preferred Tenderers will enter into a NDA within one (1) week to facilitate full disclosure of all other relevant sensitive and proprietary Operation & Maintenance ("O&M") documentation. Tenderers unable to agree an NDA within this time period may be eliminated from further competition
Stage 3 - Issue Invitation to Participate. This stage will include the preliminary design / FEED. ORE Catapult has set aside funding for this stage to allow tenderers to submit preliminary designs, together with cost estimates as part of their Initial ITP Response. Expected outputs from Preliminary Design phase shall be as follows:
- Project charter including participants, roles and responsibilities
- Methodology and programme for detailed design phase
- Outline programme showing key dates and project completion
- General arrangement drawings of main components
- Outline target cost plan
- List of assumptions
- Clarifications required and outstanding information needed
- Preliminary Risk Register
Tenderers shall be required to submit an initial Tender which shall be the basis for any subsequent negotiations.
Stage 4 - Draft ITP submissions - Tenderers shall be required to submit tenders, including preliminary design, in accordance with the details / instructions set out in the ITP.
Stage 5 - Negotiations - ORE Catapult reserve the right to award a Contract on the basis of the initial tender without entering into negotiation where it is in their best interest to do so. ORE Catapult also reserve the right to carry out the Competitive procedures with Negotiation in successive stages in order to reduce the number of tenders to be negotiated. ORE Catapult will inform remaining tenderers of the common deadline to submit new or revised tenders.
Stage 6 - Final Tender submission (Best and Final Offer "BAFO") - ORE Catapult verify best and
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
43328000 - Hydraulic installations
42000000 - Industrial machinery
31682210 - Instrumentation and control equipment
Keywords
instrumentation equipment
control equipment
measurement device
process control unit
sensor interface
industrial machinery
heavy machinery
production machinery
manufacturing equipment
industrial plant machinery
factory machinery
processing machinery
workshop equipment
industrial engines
plant machinery
hydraulic installation systems
hydraulic piping
hydraulic fittings
hydraulic circuit assemblies
fluid power systems
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors