Open Closing in a 20 days
GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The Works
The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots. In summary, the Works under this Contract will comprise:
• Necessary surveys, and investigations and monitoring.
• Demolition of remaining buildings (including the existing Guildford Council Depot)
• Vegetation clearance, tree felling and site strip
• Topsoil stripping
• Sitewide remediation of contamination (where required)
• Site platform and levelling
• Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors
• Swales and attenuation basins
• Surface water outfalls
• Utility infrastructure, ducting, chambers, pipework
• Highway formations
• Signage, markings, street furniture, street lighting
• Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements
• S278 Junction Works
• Maintain the reptile translocation fencing and associated inspections
Location
Location of Project:
• Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG.
• Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council’s Depot site, Guildford GU1 1QE.
• Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9
Works by Others
During these works there are likely to be the following works being undertaken by the Employer and statutory undertakers on and or around the site, including but not limited to;
• Ground water monitoring.
• Other works may be occurring adjacent to the site on the wider master site plan.
• Ecological watching brief by an independent ecologist
• Archaeological watching brief by an independent archaeologist
• Utilities works / diversions (which do not form part of the Scope of these works).
• General s278 Highways works
• Works associated with the relocation of the Sewerage Treatment Works
• Off site demolitions
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45211100 - Construction work for houses
45211350 - Multi-functional buildings construction work
45000000 - Construction work
Keywords
house building
public works
private homes
building sites
structural work
custom homes
renovation work
single dwellings
suburban housing
site construction
infrastructure projects
mixed use construction
family house projects
construction work
standard houseworks
construction services
civil engineering
building construction
combined use development
complex buildings
single family homes
adaptable building construction
multi functional buildings
multifunction architecture
flexible space structures
multifunctional facility erection
detached house construction
domestic house construction
integrated building works
multipurpose facility build
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :