Open
Heating Upgrade Framework
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Gentoo currently has 29,026 properties located in predominately 4 geographical management areas in the City of Sunderland, Houghton/Hetton and Washington. Within this housing stock 28,324 are tenanted properties and 702 are leasehold. The numbers of tenanted and leasehold properties may vary throughout the duration of the Programme. Gentoo have pledged that all properties under its ownership that currently occupy an EPC rating of band "D" or lower will receive the necessary measures required to improve this rating to a minimum of band "C" by 2030. At the time of this Tender documentation being prepared, it is anticipated that there are approximately 7,000 properties which require some form of work to enable this pledge to be realised. Properties are eligible to receive a large number of additional SAP points via the works completed as part of this Tender. Thereafter, Gentoo will release numerous further Tender opportunities to allow this pledge to be achieved. This is the first Tender opportunity, and relates to Heating Upgrade Works. The Tender is broken into 2 separate Lots, as follows: -Lot 1: Planned & Responsive Boiler Replacements; and -Lot 2: Back Boiler Removals, Boiler Installations and Secondary Heating Removals. Within Lot 1, there are currently 401 planned boiler replacements scheduled to be completed over a 2-year period, and it is estimated there will be approximately 800 responsive installations per year - however, this number is subject to fluctuation. Within Lot 2 there are currently 225 boiler replacements, 48 back boiler and gas fire installations to be removed completely and replaced with a condensing combi boiler and there are 225 gas and electric secondary heating removals to be completed. Regardless of whether the works are planned or responsive, the scope of the work will effectively be the same, and those works will include, but may not be necessarily limited to, the following across the 2 Lots: -Installation of combination gas boilers; -Installation of system gas boilers; -Installation of radiators; -Upgrade of existing heating control systems; -Cylinder insulation and replacement; -Replacement of full distribution systems ; and -General Building Works in relation to energy performance. -Removal of back boilers; -Removal of secondary heating appliances including all making good. Each Lot will run for separate durations. Those durations are as follows: - Lot 1; four years, commencing in June 2024 and concluding in June 2028; and - Lot 2; two years, with 2 optional extension clauses of 12-months each, maximum duration of four years. Commencing in June 2024 and set to conclude in June 2026. Gentoo will notify the Providers in early 2026 if the first of the available optional extension clauses is to be utilised. Gentoo will establish a Framework for each Lot. The number of Providers on each Framework is still yet to be determined, but will be confirmed within the Tender documents.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
42163000 - Steam generators
42165000 - Steam condensers
42164000 - Auxiliary plant for use with boilers
42161000 - Hot-water boilers
42160000 - Boiler installations
42162000 - Steam-generating boilers
Keywords
boiler plant
feedwater system
boiler equipment
boiler unit
hot water boiler
superheater
steam boiler
economizer unit
steam generator
boiler mounting
nuclear SG
boiler assembly
header assembly
boiler house
boiler condenser
steam plant
process boiler
deaerator
boiler drum
steam condenser
boiler system
steam module
fire-tube boiler
blowdown tank
boiler feed pump
boiler module
hydronic boiler
vapor condenser
boiler auxiliary plant
boiler installation
condensate heat recovery
steam generation system
power plant condenser
packaged steam boiler
industrial boiler plant
indirect water heater
boiler control system
industrial steam unit
water-tube boiler
steam production unit
shell-and-tube condenser
steam boiler unit
central heating boiler
process steam unit
heat exchanger condenser
steam heating system
packaged steam generator
condensate recovery unit
process steam recovery
industrial steam condenser
industrial steam generator
boiler feedwater generator
domestic hot-water heater
heat recovery steam generator
heating boiler installation
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :