Awarded
HS2 Main Works S1 & S2 - WP171 SCL Formwork
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
The scope for this package is the supply of SCL Formworks. SCS require lining shutters to construct cast insitu concrete tunnel secondary linings. The works will include: *Technical design *Design to British or European Standards. *Provision of calculations and drawings, including design of all temporary loads such as concrete pressure and uplift/floatation without penetrations through the shutter or waterproof membrane. *Provision of erection sequence /shop drawings *Manufacture and delivery of formwork to SCS jobsites, at multiple locations along the HS2 S1 and S2 contract. *Initial assembly of the system in the tunnel. *Buy-back of the system. The works are split in to 3no. separate packages: 1)Cross Passages a.Access limited to cross passage by openings in the TBM running tunnel of 2.850 x 1.900m b.Secondary lining invert will have previously been cast flat. c.Secondary lining thickness of ~250mm. d.Shutter internal dimensions ~2.7m high x 3.3m wide. e.Cast in a single pour. f.Cross passages varying in length from 5-5.8m. The shutter should be adaptable to suit this length, and the combined TBM horizontal driving tolerances from both bores g.Due to access limitations for mechanical lifting, the shutter should take into consideration UK manual handling legislation. h.Required for July 2022 2)Old Oak Common SCL Tunnels a.Secondary lining shutters to facilitate the construction of both the Upline and Down running tunnels concurrently (2no complete sets of panels and carriages required) b.Shutter internal dimensions ~10m diameter. c.Formwork to be adaptable for a range of profiles, with common arc sections and make up pieces. d.Cast in a single pour. e.Shutter suitable for pours ~10m in length. Adaptable for make-up pours f.Formwork to be carriage mounted and hydraulically operated. g.Secondary lining invert will have previously been cast flat. h.Secondary lining thickness of ~350mm i.Facing material suitable for up 20no. of pours, with no access to clean or oil, whilst still providing F2 finish. j.Required for April 2023 3)Euston SCL Tunnels a.Secondary lining shutters to facilitate the construction of i.both the Upline and Down Crossover tunnels concurrently (2no complete sets of panels and carriages required) ,internal dimensions ~10m diameter. ii.Cavern crossover of varying sizes (15m, 13m and 11m), formwork to be adaptable for a range of profiles with common arc sections and make up pieces where possible. b.Cast in a single pour. c.Shutter suitable for pours ~10m in length. Adaptable for make-up pours d.Formwork to be carriage mounted and hydraulically operated. e.Secondary lining invert will have previously been cast flat. f.Secondary lining thickness of ~350mm g.Facing material suitable for up 35no. of pours, with no access to clean or oil, whilst still providing F2 finish. h.Required for Jan 2024
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
14622000 - Steel
45223500 - Reinforced-concrete structures
45262310 - Reinforced-concrete work
43123000 - Tunnelling machinery
45221247 - Tunnelling works
44114000 - Concrete
44114200 - Concrete products
45262300 - Concrete work
45223210 - Structural steelworks
Keywords
steel
TBMs
concrete
concrete framing
concrete work
TBM tunnelling
concrete slabs
manhole sections
ferrous metal
tunnel shafting
carbon steel
tunnel boring
concrete blocks
alloy steel
tunnelling works
RCC building
poured concrete
girder erection
trenchers
subterrain tunnel work
civil concrete works
reinforced-concrete work
tunnel excavation works
steel framing build
reinforced concrete pour
mass concrete placement
steelwork construction
mining tunnellers
RC skeleton erection
RC structure erection
precast concrete units
civil tunnelling project
structural concrete
cast-in-place concrete
structural RC framing
ready mix concrete
RC building framework
building concrete
rock-boring for tunnels
tunnel boring machines
rebar concrete structure
concrete slab pouring
heavy steel framework
beam and column assembly
concrete products
tunnel lining work
steel-concrete composite construction
concrete beam and column work
load-bearing concrete structure
structural concrete build
concrete superstructure work
structural concrete works
reinforced concrete shell build
underground drive construction
reinforced concrete structure build
reinforced steel structures
concrete core construction
concrete frame construction
industrial steel skeleton
underground excavation machines
in-situ concrete construction
load-bearing steel components
reinforced slab construction
concrete foundation building
high-strength reinforced concrete work
civil steel infrastructure
seismic RC structure build
structural steel element erection
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :