HS2 Main Works S1 & S2 - WP171 SCL Formwork

Descriptions

The scope for this package is the supply of SCL Formworks. SCS require lining shutters to construct cast insitu concrete tunnel secondary linings. The works will include: *Technical design *Design to British or European Standards. *Provision of calculations and drawings, including design of all temporary loads such as concrete pressure and uplift/floatation without penetrations through the shutter or waterproof membrane. *Provision of erection sequence /shop drawings *Manufacture and delivery of formwork to SCS jobsites, at multiple locations along the HS2 S1 and S2 contract. *Initial assembly of the system in the tunnel. *Buy-back of the system. The works are split in to 3no. separate packages: 1)Cross Passages a.Access limited to cross passage by openings in the TBM running tunnel of 2.850 x 1.900m b.Secondary lining invert will have previously been cast flat. c.Secondary lining thickness of ~250mm. d.Shutter internal dimensions ~2.7m high x 3.3m wide. e.Cast in a single pour. f.Cross passages varying in length from 5-5.8m. The shutter should be adaptable to suit this length, and the combined TBM horizontal driving tolerances from both bores g.Due to access limitations for mechanical lifting, the shutter should take into consideration UK manual handling legislation. h.Required for July 2022 2)Old Oak Common SCL Tunnels a.Secondary lining shutters to facilitate the construction of both the Upline and Down running tunnels concurrently (2no complete sets of panels and carriages required) b.Shutter internal dimensions ~10m diameter. c.Formwork to be adaptable for a range of profiles, with common arc sections and make up pieces. d.Cast in a single pour. e.Shutter suitable for pours ~10m in length. Adaptable for make-up pours f.Formwork to be carriage mounted and hydraulically operated. g.Secondary lining invert will have previously been cast flat. h.Secondary lining thickness of ~350mm i.Facing material suitable for up 20no. of pours, with no access to clean or oil, whilst still providing F2 finish. j.Required for April 2023 3)Euston SCL Tunnels a.Secondary lining shutters to facilitate the construction of i.both the Upline and Down Crossover tunnels concurrently (2no complete sets of panels and carriages required) ,internal dimensions ~10m diameter. ii.Cavern crossover of varying sizes (15m, 13m and 11m), formwork to be adaptable for a range of profiles with common arc sections and make up pieces where possible. b.Cast in a single pour. c.Shutter suitable for pours ~10m in length. Adaptable for make-up pours d.Formwork to be carriage mounted and hydraulically operated. e.Secondary lining invert will have previously been cast flat. f.Secondary lining thickness of ~350mm g.Facing material suitable for up 35no. of pours, with no access to clean or oil, whilst still providing F2 finish. h.Required for Jan 2024

Timeline

Published Date :

17th Oct 2022 3 years ago

Deadline :

19th Oct 2021 4 years ago

Contract Start :

4th Mar 2022

Contract End :

30th Jun 2023

Tender Regions

CPV Codes

14622000 - Steel

45223500 - Reinforced-concrete structures

45262310 - Reinforced-concrete work

43123000 - Tunnelling machinery

45221247 - Tunnelling works

44114000 - Concrete

44114200 - Concrete products

45262300 - Concrete work

45223210 - Structural steelworks

Keywords

steel

TBMs

concrete

concrete framing

concrete work

TBM tunnelling

concrete slabs

manhole sections

ferrous metal

tunnel shafting

carbon steel

tunnel boring

concrete blocks

alloy steel

tunnelling works

RCC building

poured concrete

girder erection

trenchers

subterrain tunnel work

civil concrete works

reinforced-concrete work

tunnel excavation works

steel framing build

reinforced concrete pour

mass concrete placement

steelwork construction

mining tunnellers

RC skeleton erection

RC structure erection

precast concrete units

civil tunnelling project

structural concrete

cast-in-place concrete

structural RC framing

ready mix concrete

RC building framework

building concrete

rock-boring for tunnels

tunnel boring machines

rebar concrete structure

concrete slab pouring

heavy steel framework

beam and column assembly

concrete products

tunnel lining work

steel-concrete composite construction

concrete beam and column work

load-bearing concrete structure

structural concrete build

concrete superstructure work

structural concrete works

reinforced concrete shell build

underground drive construction

reinforced concrete structure build

reinforced steel structures

concrete core construction

concrete frame construction

industrial steel skeleton

underground excavation machines

in-situ concrete construction

load-bearing steel components

reinforced slab construction

concrete foundation building

high-strength reinforced concrete work

civil steel infrastructure

seismic RC structure build

structural steel element erection

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk