Find public sector tenders
Search and find UK govt public sector tenders - full contract/frameworks/DPS/Prior information notice
Search for tenders by ...
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North. Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - ....
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North. Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - ....
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North. Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - ....
Thames Tideway Tunnel Project — Main Works — Category 1, C405 Thames Tideway ....
Buyer : Thames Water Utilities Limited
Although this procurement was commenced and conducted by Thames Water Utilities Limited (TWUL), the contract is entered into by the successful Infrastructure Provider, Bazalgette Tunnel Limited, pursuant to the procedure set out in Section VI.3) of t ....
Buyer : scs jv
The works are located at Northolt Tunnels West (NTW) Northolt Tunnels East (NTE) and Euston Tunnels (ET). At each location a twin-bore tunnel will be constructed, forming two parallel tunnels, each containing a single rail track. SCS JV will construc ....
Buyer : scs jv
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North. Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - ....
Mechanical, Electrical, Public Health (MEPH) and Lifts.
Buyer : scs jv
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North. Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - ....
Buyer : scs jv
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North. Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - ....
Buyer : scs jv
High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North. Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - ....
Supply and delivery of temporary survey equipment (Gyromat or similar). •The tunnels are High Speed rail infrastructure, therefore the alignment consists of straight lines and very smooth curves (minimum curve radius ~2.5km). The maximum gradient i ....
Signup now for more tenders
Unlock the details of all tenders
Get to know more about our latest features.