Awarded
Infrastructure Provider for the Thames Tideway Tunnel Project.
Descriptions
The Thames Tideway Tunnel project will modernise London's sewerage system, delivering environmental and economic benefits to the UK's capital for generations. A major new sewer, the ‘Thames Tideway Tunnel’, is urgently needed to provide long overdue and necessary additional sewer capacity to protect the River Thames from increasing pollution. It will help tackle the problem of the capital's Victorian sewers overflowing into the River Thames and enable the UK to meet European environmental standards. The Thames Tideway Tunnel will run to approximately 25 km and up to 70 m deep underground (requiring excavation), broadly following the River Thames and will connect with Thames Water Utilities Limited's (‘Thames Water’) existing sewer network. On 4.6.2014, the Department of Environment Food and Rural Affairs (‘Defra’) issued a notice specifying the Thames Tideway Tunnel as a ‘specified infrastructure project’ (‘Specification Notice’) under the Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (‘SIP Regulations’) and a further preparatory work notice describing preparatory work that Thames Water is permitted or required to undertake for the Project (‘Preparatory Work Notice’). These notices took effect from 5.6.2014. A copy of the Specification Notice and the Preparatory Work Notice can be found at https://www.gov.uk/government/publications/thames-tideway-tunnel-project-specification-and-preparatory-work-notices Pursuant to the SIP Regulations, Thames Water was required to tender the project that has been specified and is prohibited from carrying out that project except for the work described in the Preparatory Work Notice. Pursuant to this contract notice, Thames Water is putting the design, construction, ownership, operation of the Thames Tideway Tunnel project together with the associated financing (the ‘Project’) out to tender. Following the tender of the Project, Thames Water has selected a party to finance, design, construct, own and operate the Project on the basis of the most economically advantageous tender and the Water Services Regulation Authority (‘Ofwat’) has designated the successful bidder, Bazalgette Tunnel Limited as an ‘infrastructure provider’ (as that term is defined in the SIP Regulations) (‘Infrastructure Provider’) pursuant to regulation 8(1) of the SIP Regulations and with effect from 24.8.2015 has granted it a Project licence (‘Project Licence’).The Infrastructure Provider will now commence the Project and on 24.8.2015 entered into a number of contracts in relation to these responsibilities. These are as the procurement documents issued to bidders that were selected to tender for the Infrastructure Provider.
Timeline
Published Date :
Deadline :
Tender Awarded :
Awarded date :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45221200 - Construction work for tunnels, shafts and subways
45221245 - Under-river tunnel construction work
45221244 - Canal tunnel construction work
45221247 - Tunnelling works
45221240 - Construction work for tunnels
45232411 - Foul-water piping construction work
71540000 - Construction management services
45232410 - Sewerage work
45231300 - Construction work for water and sewage pipelines
71541000 - Construction project management services
45000000 - Construction work
66100000 - Banking and investment services
45221000 - Construction work for bridges and tunnels, shafts and subways
45232400 - Sewer construction work
Keywords
construction work
building construction
civil engineering
infrastructure projects
site construction
building sites
structural work
construction services
renovation work
public works
bridge and tunnel construction
shaft erection work
subway build
overhead and underground crossing construction
viaduct and underpass building
substructure works
civil crossing facilities
transportation passage construction
tunneling and bridging build
urban transit structure
tunnel construction
shaft excavation work
underground passage construction
sub-surface civil works
tunnel and shaft engineering
metro infrastructure build
subterranean civil work
tunnel boring projects
underground transit tunnel build
underground passage build
civil tunnel engineering
bore construction
tunnel excavation
sub-surface structure build
road/rail tunnel work
cross-mountain tunneling
subterranean transit work
civil buried structure
canal tunnel build
waterway tunnel construction
canal underpass erection
aqueduct tunnel build
canal subsurface structure
boating tunnel construction
canal passage excavation
water transport tunnel
canal conduit build
hydrological tunnel
under-river tunnel construction
riverbed tunnel build
subaqueous tunnel erection
watercourse tunnel construction
submerged tunnel work
tunnel under river
crossing beneath riverbed
hydrological subsurface passage
sub-river transit tunnel
river tunnel engineering
tunnelling works
tunnel boring
underground drive construction
TBM tunnelling
tunnel excavation works
rock-boring for tunnels
subterrain tunnel work
tunnel shafting
civil tunnelling project
tunnel lining work
water pipeline installation
sewage conduit construction
wastewater main laying
sanitary sewer build
drainage pipeline works
utility water line build
sewage disposal conduit
fluid transport pipelaying
sewage infrastructure erection
water network pipeline work
sewerage network construction
wastewater pipeline build
sanitary sewer installation
underground sewer trenching
municipal drain build
stormwater/sewer conduit work
sewage main laying
combined sewer system build
wastewater disposal pipeline works
sub-surface sewer installation
sewerage infrastructure works
sewage network construction
waste & storm sewer build
sewer pipeline installation
municipal sewer works
sanitary drainage network build
sewerage civil works
pipeline trenching for sewerage
sewer system erection
wastewater line build
foul‑water piping build
sewage pipe installation
wastewater conduit erection
domestic sewage plumbing
foul drain network build
waste-water pipework
sanitation pipeline construction
foul-water trench laying
sewer service line build
wastewater plumbing works
banking services
investment advisory
capital markets
financial intermediation
asset placement
portfolio funding
financial brokerage
market investment services
investment facilitation
financial operations
site operations management
contractor scheduling
budget reconciliation
change order administration
resource planning
workflow optimization
risk mitigation planning
site logistics strategy
milestone target planning
cost overrun analysis
deliverable verification
contractor briefing
document control system
project communication coordination
contract closure process
construction project management
project scheduling
budget planning
resource coordination
risk management
stakeholder liaison
quality assurance planning
contract administration
procurement oversight
progress reporting
milestone tracking
construction coordination
regulatory compliance monitoring
value engineering
site logistics planning
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors