Kettering General Hospital seeks to appoint an independent NEC Supervisor consultant service, that will act in accordance with NEC4 ECC, providing independent inspection, monitoring & certification of the works to ensure compliance with:

• The Works Information

• Contract requirements

• Statutory approvals

• Relevant healthcare technical standards (HTMs/ HBNs) agreed with MMC and BREEAM targets, infection control and fire safety regulations, etc.

Contracting Authority Objective

 

The Contracting Authority is seeking to procure MEP and Building Structure/Fabric NEC supervisor services for the Rockingham Wing Extension to:

• Ensure that the contractor satisfies the quality standards set in the works information

• Have a regular presence on site, providing independent scrutiny of the works, ensuring the correct materials are used and to the correct standards.

• Have foresight, to enable identification of issues/potential issues and prevent them from occurring.

• Have the authority to issue instructions to search for defects and be specifically responsible for issuing Defects Certificates.

• Witness any testing

• Attend progress meetings

• Issue communications as per the requirements of the contract.

• Have the right attitude which should be team-spirited, proactive and systematic.

 

Scope / Specification

1. Pre-Construction Phase

• Review works information, scope, drawings, specifications, and quality requirements

• Input to constructability and sequencing reviews

• Review contractor proposals for working in close proximity to a live maternity / neonatal environment

• Advise on access, phasing, infection prevention, and clinical risk controls

• Attend design and pre-start meetings as required

 

2. Construction Phase

• Carry out inspections and monitoring of the Works in accordance with NEC4

• Check compliance with Works Information, specifications, and approved details

• Undertake random checks on Labour Returns (1 per month)

• Attend site regularly and record inspections, non-conformances, and observations

• Issue Defects, Non-Conformance Reports, and Acceptance Certificates as required

• Witness testing, commissioning, and validation activities (including M&E and medical gases where applicable). Retain and file electronic copies of all test certificates

• Review Contractor quality records, test results, and as-built information

• Jointly with project managers coordinate with clinical teams to minimise disruption to maternity and neonatal services

• Support the Project Manager with early identification of quality or compliance risks

 

3. Completion and Handover

• Inspect works at Completion and issue Completion Certificates

• Prepare and maintain Defects Lists

• Monitor rectification of defects during the Defects Period

• Attend commissioning, handover, and readiness-for-service activities

• Support clinical handover, including phased or partial occupation if required

• Verify completion of statutory approvals and certifications

• Attend post completion inspections and meeting during Year 1 of the Soft Landings process

 

4. Defects Period

• Undertake inspections during the Defects Period

• Confirm correction of notified defects

• Support issue of Defects Certificate

 

5. A weekly report shall be submitted directly to the Client and copied to the Project Manager, which shall provide the following information:

• A record of progress on a trade by trade basis.

• A record of time lost due to inclement weather and the trades affected by this.

• A record of any delays to any part of the works and the reasons for this.

• A record of drawings received.

• A record of critical deliveries to site.

• A record of any significant events including any serious deficiencies in health or safety performance observed while on site.

• A short commentary on site Health & Safety.

• Provide Photographic evidence of installations and/or non-compliant works as required.

• Any other information to which the Supervisor and PM should be made aware of.

Timeline

Published Date :

2nd Feb 2026 Yesterday

Deadline :

9th Feb 2026 in a 6 days

Contract Start :

31st May 2026

Contract End :

1st Jun 2027

Keywords

MEP consulting

tender document drafting

lifecycle cost analysis

buildability assessment

cost control strategy

HVAC advisory services

MEP optimization advice

schedule simulation

site access planning

pre-tender consultancy

building systems design advice

technical systems consulting

construction optimization analysis

technical advisory services

stakeholder requirement alignment

procurement strategy advice

electrical & plumbing consultancy

value engineering assessment

sustainability compliance planning

facility services consultation

project viability appraisal

integrated systems design

construction logistics analysis

utility services consultancy

building services planning

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

PIN

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk