Open Closing in a 1 month
Kings Hall repairs and refurbishment Architect and Design team
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
Project Overview
Canterbury City Council is commissioning a refurbishment and upgrade project at Kings Hall, Herne Bay. The scope includes:
Fabric Repairs: Essential repairs to the building envelope and internal finishes to preserve the historic character and ensure long-term durability.
Mechanical & Electrical Services: Upgrading/renewal of existing systems to meet modern standards for energy efficiency, safety, and operational performance.
Remodeling: To improve functionality and address previous unsympathetic alterations. This building supports externally accessible public toilets as well as venue facilities. CCC has developed concept designs which are considered close to meeting our requirements which include:
Creating an attractive destination seafront bar/cafe separate, yet available to the main hall.
Improving the main hall and backstage areas, including modernising acoustics and seating to attract more commercially successful shows.
Exploring opportunities to increase the capacity of the main hall.
The architect will be appointed as Lead Consultant and will be responsible for:
Reviewing and developing CCC's concept designs.
* Forming, leading and coordinating a full design team to deliver a complete Turnkey Service. Identifying all necessary sub-consultants (e.g., structural, civil, M&E engineers, and any other specialists) Appointing the team directly.
** Advising on and arranging any additional surveys required to bring the project to completion.
Producing all required outputs in line with the RIBA Plan of Work, from Stage 2 through to Stage 7.
Delivering a complete design package suitable for procurement via the Kent Business Portal.
Supporting CCC's appointed Quantity Surveyor throughout the project lifecycle.
Under the CDM Regulations 2015, CCC is the Client and has appointed a Quantity Surveyor. The architect will be expected to act as Principal Designer. If the architect does not have the capability to act as Principal Designer, they must propose a suitably qualified party to fulfil this role and include associated fees in their submission.
*CCC is seeking a complete design package, including any structural, M&E and other requirements. If the architect does not have the relevant engineering and other expertise in-house CCC requires them to propose a design team, including these consultants, to allow them to deliver a complete 'Turnkey Service'. Engineering services and all other sub-consultant's fees should therefore be included in this tender submission. All necessary consultants are to be appointed directly by the Architect.
**The architect should provide details of any additional surveys, including costs, required to complete the project in their tender submission.
To view this notice, please click here:
https://www.kentbusinessportal.org.uk/delta/viewNotice.html?noticeId=1005248738
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71200000 - Architectural and related services
Keywords
architectural consultancy
urban planning
blueprint design
building drafting
design advisory
architectural planning
structural drawing
façade design
landscape architecture
building concept
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement Contact
Name :
Phone :
Email :
Possible bidding competitors
Top 10 Possible bidding competitors