Awarded
Lt229/230 Ugc Ducts - Strathy Wood To Strathy South
Descriptions
The Strathy South project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy South windfarm on the network. As part of these works, there is a requirement for approximately 5.5 km of new 132kV underground cable constructed from the site of Strathy South 132/33kV Substation. Due to phasing of works, there is a requirement for an advanced works package to be tendered for installation of the cable ducts. The cable ducts run under a road which will serve as the access track for the windfarm development therefore, these works will need to be completed prior to the windfarm site start date.
Timeline
Pretender :
Pblished Date :
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
electric power line installation
high-voltage line construction
overhead transmission line build
power grid erection
electrical distribution infrastructure
utility line installation
energy corridor build
electric conductor installation
overhead cable line work
power transmission structure
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors