Lt229/230 Ugc Ducts - Strathy Wood To Strathy South

Descriptions

The Strathy South project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy South windfarm on the network. As part of these works, there is a requirement for approximately 5.5 km of new 132kV underground cable constructed from the site of Strathy South 132/33kV Substation. Due to phasing of works, there is a requirement for an advanced works package to be tendered for installation of the cable ducts. The cable ducts run under a road which will serve as the access track for the windfarm development therefore, these works will need to be completed prior to the windfarm site start date.

Timeline

Published Date :

1st Jan 2021 in a 5 days

Published Date :

19th May 2025 8 months ago

Deadline :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

power grid erection

overhead cable line work

energy corridor build

electric power line installation

high-voltage line construction

overhead transmission line build

electric conductor installation

utility line installation

electrical distribution infrastructure

power transmission structure

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Name :

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk