Awarded

Lt229/230 Ugc Ducts - Strathy Wood To Strathy South

Descriptions

The Strathy South project proposes the establishment of a 132/33kV substation to allow the connection of the Strathy South windfarm on the network. As part of these works, there is a requirement for approximately 5.5 km of new 132kV underground cable constructed from the site of Strathy South 132/33kV Substation. Due to phasing of works, there is a requirement for an advanced works package to be tendered for installation of the cable ducts. The cable ducts run under a road which will serve as the access track for the windfarm development therefore, these works will need to be completed prior to the windfarm site start date.

Timeline

Pblished Date :

1st Jan 2021 in a 4 days

Published Date :

19th May 2025 4 months ago

Deadline :

N/A

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Keywords

electric power line installation

high-voltage line construction

overhead transmission line build

power grid erection

electrical distribution infrastructure

utility line installation

energy corridor build

electric conductor installation

overhead cable line work

power transmission structure

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Name :

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors