Closed

Manchester International Airport - Devegetation

Descriptions

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. Kier are seeking expressions of interest for devegetation works to clear a portion of the site ready for surveys to be conducted. The works will commence in early February 2025, will require competent PTS qualified labour and disposal of cleared material. The tenderer may wish to conduct a site visit to verify the extent of the works required, please make contact if this is required.

Timeline

Published Date :

16th Jan 2025 12 months ago

Deadline :

24th Jan 2025 11 months ago

Contract Start :

N/A

Contract End :

N/A

Keywords

land clearing

site readiness

scrap clearing

land preparation

site cleanup

site preparation

ground clearing

area clearance

scrub clearance

site clearance

debris removal

site cleaning

rubble removal

tree clearing services

underbrush removal

land opening work

airport landscaping

vegetation removal

preparatory clearance

airfield grounds prep

surface preparation

forest land clearance

terminal area greenery

area deforestation

vegetation clearing

waste site cleaning

site-clearance work

runway verge planting

logging clearance

demolition clearance

topsoil stripping

forestry clearing

airport grass installation

landscape design for airports

airport planting services

aviation facility landscaping

construction site clearing

green buffers at aerodromes

landscaping around runways

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Procedure :

N/A

Suitable for SME :

No

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk