Awarded
Manufacture and Installation of Industrial Ductwork and Associated Equipment
Descriptions
EPK are inviting tenders from qualified economic operators for the supply and delivery of specialist industrial ductwork, including all manufacturing and the installation, at the Kilroot power station.EPK have employed the services of RJM (Principle Designers) to design the SUFA (Secondary Under Fired Air) system. The purpose of this SUFA system will be to inject air directly into the centre of the rotating fireball, via the furnace hopper and reduce the levels of unburnt carbon.A key element of this system is a section of new ductwork which will supply preheated air to the furnace. This ductwork will transport air from the existing SA system, down towards the hopper and in through the hopper to the SUFA ports.Approximately 35 m of new ductwork is required, along with all associated equipment – coated support steelwork, fasteners, fixings, cladding, lagging, screws, gasket material, expansion joints, dampers and instrumentation.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
Wales
CPV Codes
45251230 - Steam-generation plant construction work.
Tenderbase Categories
Engineering/ Waste Management/ Pipelines / Telephone and Communication Line/ Roads and Highways/ Railways and Cable Transport/Water Project
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Tender Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors