Closed

Marchwood Port Development - Phase 1-3 Design and Build

Descriptions

SGL are pursuing consent for the proposed redevelopment of Marchwood Port via the Town and Country Planning Act with works commencing from Q1 2022 following anticipated planning approval in October 2021. , Works are anticipated to be delivered in six phases between 2022 - 2027 with Phases 1 to 3 being the subject of this procurement and contract ("the Project")., The Project is intended to be delivered in three phases, although it is noted that capital expenditure associated with Phase 1 will deliver approximately 90-95% of value of the Project., The works, which are mainly terrestrial based, are likely to comprise but are not limited to: , 1.Creation of hard-standing surfaces (which forms the majority of the scope of work) providing flexible external storage for the following: , a.Containers , b.Vehicles , c.Steel (clean and scrap) , d.Forest Products , e.Bulks and aggregates , f.Palletised cargo. , 2.Modifications to main port entrance including the construction of a new Security Office and Entrance Canopy (providing three vehicle lanes)., 3.Enhancement and upgrade of existing CCTV, drainage (including 2no. new drainage outfalls), lighting, telecommunications, gas and power. , 4.Enhancement and upgrade of the site perimeter fencing., 5.Modification of rail sidings., 6.Demolition and/or modification to existing buildings , SGL plan to appoint a contractor on a design-build basis with services summarised as follows:, Phase 1 , •RIBA Stage 4 - Technical Design, •RIBA Stage 5 -Construction, Phase 2 and Phase 3, Step 1 , •RIBA 3 - Developed Design (developed against agreed planning parameters)., •Reserved Matters/Detailed Planning Application, Step 2 (dependent on outcome of Step 1 SGL can, at its sole discretion, elect to the following RIBA Stages), •RIBA 4 - Technical Design, •RIBA 5- Construction , The form of contract will be an amended NEC4 Option A., SGL will retain options in respect of Phase 2 and Phase 3 with regard to the nature of the hardstanding to be instructed., SGL plan to appoint a main contractor who will:, •provide SGL with a single point of contact for both design and construction;, •possess the required competence and demonstrable experience of delivering the breadth of works proposed (including an ability to make effective use of opportunities for transporting materials by sea);, •fulfil responsibilities as the Principal Contractor and Principal Designer in respect of Construction (Design and Management) Regulations 2015;, •expedite the swift resolution of any emerging site issues drawing on the contractor's variety of experience (including temporary works design) and breadth of supply chain;, •promote a coordinated approach to the scheduling of works;, •ensure an effective and timely response to the loss of port amenity as indirectly caused by the work; and , •assist the identification of value engineering and management opportunities., The key construction objectives for the development of the Marchwood Port are to:, •minimise cost to the project and drive best value to SGL through the early identification of value adding techniques;, •expedite delivery of the programme to maximise commercial opportunity, pursuing concurrent uninterrupted delivery across multiple sites where aligned with SGL's business case;, •prevent unnecessary restriction or hindrance to ongoing SGL operations during construction;, •place safety at the centre of all construction activity;, •maintain good relations with the Marchwood community and key stakeholders taking corrective measures to address any concerns they may have;, •where possible, utilise the port's existing rail connections and berthing capacity for the movement of plant and materials (reducing demands on the local road network); and, •deliver sustainably by minimising waste and using renewable and recyclable resources, reducing energy consumption and waste and protecting the natural environment.

Timeline

Published Date :

15th Jun 2021 in a 3 years

Deadline :

15th Jul 2021 in a 3 years

Contract Start :

N/A

Contract End :

N/A

Tender Regions

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors