Open Closing in a 24 days
Maxwell Building 8th Floor Remediation Project
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
1.1.1. The University of Salford (UoS) is a leading public institution located in Greater Manchester, UK, with a strong reputation for combining academic excellence and industry engagement. Established in 1967, it serves over 20,000 students across undergraduate, postgraduate, and research programs. Salford is recognised for its close ties to industry, particularly in media, health, engineering, and digital sectors, supported by its strategic location adjacent to MediaCityUK. 1.1.2. The University is the single occupier of the Maxwell Building. The building houses professional services, teaching spaces and a canteen on the ground floor. The building is located centrally on the Peel Park campus and is the main campus reception. The proposed work area is located on the North Wing of the 8th floor which is currently used for teaching and office space. 1.1.3. The University has been unable to access several ceiling voids across the 8th floor due to the presence of asbestos containing materials in varying condition. To address this, the University proposes to remove the asbestos containing materials and carry out an environmental clean of the affected ceiling voids in accordance with the Life Environmental Removal Specification contained within Appendix E. The works will also involve the replacement of existing suspended ceilings, new floor finishes, new corridor doors and lighting upgrades. The University intends to appoint a Principal Contractor to deliver all elements of the works under a single package. 1.1.4. The scheme will be completed during the normal works hours of Monday to Friday 07:30 - 17:00. It is proposed the University will vacate the North Wing of the 8th Floor, for the full duration of works however the wider building, including the adjoining spaces on the 8th Floor, will be in use for the duration of the construction period. Contractors must outline how works will be segregated to allow continued use of the building within the quality response. 1.1.5. Indicative project timescales: ▪ Site Commencement - Monday 18th May 2026 ▪ Practical Completion - Monday 13th July 2026
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
31527260 - Lighting systems
45000000 - Construction work
Keywords
lighting network
public works
building sites
structural work
renovation work
site construction
infrastructure projects
construction work
construction services
civil engineering
outdoor lighting setup
building construction
architectural lighting system
integrated lighting system
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Buyer Information
Name :