Closed
M2223-06Mornington & Riverstone Lift Refurbishments
Descriptions
The works are to modernise Firstly the existing Hydraulic Passenger Lift at Mornington House, Secondly the Top Drive Electric Lift at Riverstone. The lift site works shall run consecutively, with the lift at Mornington to commence first followed by commencement of Riverstone lift upon Full Completion upon at Mornington.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
Keywords
lifts
elevators
passenger lifts
goods lifts
bath lifts
service lifts
wheelchair lifts
residential elevators
hydraulic lifts
traction elevators
elevator parts
lift controller spare
elevator doors
elevator cable part
carriage guide shoe
counterweight part
elevator pulley
traction sheave
elevator shaft component
lift safety gear
lift installation
elevator fitting
vertical transport system
building lift system setup
passenger lift works
freight elevator installation
mechanical hoist fitting
shaft and lift cabin install
escalator and lift combination works
internal lift system
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors