Nant y Mwyn 25-26 Scour Protection Works

Descriptions

The purpose of these works is to prevent the Nant y Bai watercourse from continuing to scour (causing active erosion of) spoil heaps that make up its banks and causing mobilisation of metal-rich spoil into the watercourse. It is proposed to install a mixture of scour protection interventions including rock filled rolls and bags, geotextile matting and wooden stakes at a number of discrete areas along the bank to stabilise the spoil and prevent ongoing erosion by the Nant y Bai. We would welcome input from the Contractor regarding current design methodology based on previous experiences.

 

The Works comprise the following:

• Install scour protection measures in accordance with the drawings;

• Install slope stabilisation measures in accordance with the drawings;

• Supply and install 150No. rock filled bags as specified on the drawings and as directed on site to provide scour protection in Areas 3, 5 and 6;

• Translocate Purple Moor grass into the working area in accordance with the drawings. The source of Purple Moor grass to be agreed with the ecological supervisor but shall be within the Site;

• Install silt traps in accordance with the drawings;

• Install an overland pipe with associated capture structure and outfall structure in accordance with the drawings;

• Deliver plant and materials along designated routes to limit impact on the protected ecology and provide any equipment necessary to minimize the impact on the designated routes. This may include helicopters to aid in load lifting and placement of rock roll bags; and

• Plan and execute temporary flow diversion measures to enable the Works in the river bed to be completed.

 

The Works must be carried out, including transportation of plant and materials, in a way that:

• Does not cause undue harm to the local ecology, including plants, trees and particularly the protected Calaminarian habitats (comprising metallophyte flowering and non-flowering plant species);

• Does not damage local heritage features, including historic mining structures and artefacts;

• Does not cause undue disruption to the local community;

• Does not cause damage to existing services;

• Does not cause damage to the forest track road,

• Is in accordance with the relevant Environmental Action Plan (EAP) as prepared by the Mining Remediation Authority and agreed with NRW.

Timeline

Pblished Date :

27th Aug 2025 in a 2 days

Published Date :

7th Nov 2025 3 days ago

Deadline :

5th Dec 2025 in a 25 days

Contract Start :

19th Jan 2026

Contract End :

2nd Mar 2026

Tender Regions

Keywords

archaeological excavation work

site digs

heritage digs

archaeological trenching

artifact recovery

historic site excavation

site archaeology

cultural excavation

heritage unearthing

archaeologist digs

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

N/A

Suitable for SME :

Yes

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors