Descriptions
This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study.
The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge.
At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station.
There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation.
The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage.
Scope includes but not limited to:
Installation of Mains Distribution/Lighting control cubicle
Installation of Submains
Installation of finals circuits
Installation of Lighting bollards
Installation of Earthing and Bonding
Fuse upgrades within DNO
Testing and commissioning
Inspection and Test Plan
Ellipse updates
O&M Manual
Red line Drawings
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
71334000 - Mechanical and electrical engineering services
45351000 - Mechanical engineering installation works
51100000 - Installation services of electrical and mechanical equipment
34632300 - Electrical installations for railways
Keywords
motor install
M&E consultancy
M&E engineering
pump mounting
generator wiring
security system mount
M&E technical services
overhead line equipment
electrical panel mount
control panel fitting
traction power systems
HVAC system setup
integrated M&E services
infrastructure wiring
switchgear commissioning
track power systems
rail electrification gear
M&E design and maintenance
conductor rail installations
mechanical electrical coordination
mechanical and electrical systems design
process equipment fitting
heavy machinery integration
mechanical electrical installation
mechanical engineering installation
building systems engineering
railway electrical installations
compressor foundation alignment
precision plant installation
electrical railway infrastructure
HVAC and electrical engineering
conveyor belt installation