Open Closing in a 16 days
P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E
Descriptions
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future.
The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel.
Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas.
Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas.
-Health and Safety
-Programme - Installation and Commissioning activities
-Cost
-Quality and Assurance Efficiency
-Whole Life Cost
-Carbon Efficiency
The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following:
Calculations for pipework sizing and specification including computation fluid dynamics
Analysis of stress, expansion, thrust considerations and incorporation into the design
Design of bracketry supports, anchors and associate fixings within the tunnel
Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main
Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design
Support to Costain's overall M&E design partner through concept and detailed design
Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage.
Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
35113300 - Safety installations
75251110 - Fire-prevention services
44482000 - Fire-protection devices
Keywords
safety installations
emergency shutdown systems
gas suppression installations
sprinkler systems
safety barrier installations
fire safety piping
alarm installations
leak detection systems
containment installations
safety interlock systems
fire-protection devices
sprinkler heads
fire nozzles
hydrant valves
extinguishing system parts
fire safety devices
suppression system components
fire prevention tools
fixed fire fittings
emergency response components
risk assessment inspections
fire safety audits
alarm system testing
evacuation drill facilitation
public fire training
smoke detector installation
flammability inspections
prevention compliance checks
fire hazard planning
suppression system verification
Tender Lot Details
2 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :
Procurement contact
Name :
Phone :
Email :
Possible Competitors
1 Possible Competitors