Awarded

Paddling Pool Re-surfacing

Descriptions

Hedge End Town Council are looking to resurface the paddling pool ahead of the 2023 season which begins in May. The existing facility is extremely popular, so it is crucial that these works are completed ahead of the May opening. Site Description The paddling pool was originally installed by Sunsafe in 2001 and has been resurfaced twice since in 2007 and 2014. The pool is located on the southern end of St. Johns Recreation Ground. Access is through a gate on the northern boundary leading directly from a tarmac car park. There is no formal road to the site, but the field can be safely traversed during late spring/ summer providing it has not been too wet. The existing pool wetpour surfacing is approximately 300m2 in total, including the areas below the water level, the area above water level and the area directly outside the main pool that edges the perimeter drains. Tender brief Provide options and prices to resurface the paddling pool wetpour surfacing. Quotes must include removal and disposal of the existing surface. Option 1 - To remove existing surfacing (Areas A, B & C on map above) and to supply and lay a total of (approximately) 300m² of 20mm depth EN1177 certified wetpour rubber surfacing. The design will consist of 3 'splash' shapes around the water features, a splash shape within the pool itself and a change in colour between the area in the water and the shoreline (Beach) in a mix of 3 colours - yellow, aquamarine blue and a dark blue. Option 2 - To remove existing surfacing in areas 'A' and 'B' and to supply and lay a total of (approximately) 225m² of 20mm depth EN1177 certified wetpour rubber surfacing. The design will consist of 3 'splash' shapes around the water features, a splash shape within the pool itself and a change in colour between the area in the water and the shoreline (Beach) in a mix of 3 colours yellow, aquamarine blue and a dark blue. In addition, area 'C' requires repair at the join between the wetpour and the drains which is approximately 45m in length. Option 3 - To remove existing surfacing in the blue (A) area only and to supply and lay a total of (approximately) 125m² of 20mm depth EN1177 certified wetpour rubber surfacing. The design will be similar to the existing in aquamarine blue and a dark blue 'splash' shape in the centre of the pool. In addition, area 'C' requires repair were the wetpour joins the drains which is approximately 45m in length. Additional - We would be interested to see example designs, motifs etc of previous projects as well as an indication of costs that could add interest to the site. Prices All prices are to be net, excluding VAT.

Timeline

Published Date :

2nd Jan 2025 in a 6 days

Deadline :

N/A

Tender Awarded :

1 Supplier

Awarded date :

N/A

Contract Start :

N/A

Contract End :

N/A

CPV Codes

92330000 - Recreational-area services.

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors