Closed

Prior Information Notice - HIF Rail Works Packages

Descriptions

BRIEF DESCRIPTION OF THE PROJECT, The works are located on the Hoo Peninsular. The Hoo peninsula is situated in Kent to the east of Gravesend and to the north of Chatham. As part of a Housing Infrastructure Funding Grant, Medway Council are upgrading the current freight only railway., The existing Network Rail line through the Hoo Peninsula is called the Grain Branch line which connects the North Kent Line at Hoo Junction to the Isle of Grain. The line was closed to passenger services in 1968 and is now a freight only railway, with no stations remaining. The 19km long line is a single, bi-directional line serving freight trains that use the Isle of Grain docks (Thamesport) and Cliffe sidings. The existing line will require enhancements to enable the required passenger services to operate while maintaining freight services., The new rail service will enable passengers to travel from a new station near Sharnal Street to the main line and on to London via connecting services to London Charing Cross, London Victoria, London Bridge, and London St Pancras International., 1/ Rail Enabling Works, Procurement - June 2022, Start on Site – October 2022, Duration – 12/16 Weeks, Approx. Value £700,000, Scope –, 1A Site and vegetation clearance along the rail corridor, around rail loop location and at proposed Sharnal Street location. (Approval to Work on Network Rail required), 1B Utility Diversions. (Approval to Work on Network Rail maybe required), 1C Environmental Protection and Mitigations. (Approval to Work on Network Rail maybe required), 2/ Rail Advanced Works (Approval to Work on Network Rail required), Procurement – January 2023, Start on Site – July 2023, Duration – 26/30 Weeks, Approx. Value £6,500,000, Scope –, 2A Embankment Widening to facilitate the addition of a Rail Loop, Installation/Repair of Track Drainage, Bridge Deck Replacement., 2B Signalling Cliffe to Grainport. Signalling Panel Update., 2C Track Remedial Works., 2D Installation of DNO Power Supply, FSP/PSP Signalling Power Supply, Installation of Charging Facilities at Sharnal Street Station., 3/ Rail Main Works, Procurement – January 2024, Start on Site – July 2024, Duration – 64 Weeks, Approx. Value - £41,000,000, Scope –, 3A Level Crossing Works, Main Line Signalling, Main Line Crossover, Installation of Track Loop, Signal Installation Hoo Junction to Sharnal Street Station. (Approval to Work on Network Rail required), 3B Construction of Sharnal Street Station to include, Station Building , Platform, Carpark, Access Road, together with associated drainage and earthworks and Hard and Soft Landscaping (Approval to Work on Network Rail may be required)

Timeline

Pretender :

Not Identified

Published Date :

8th Mar 2022 2 years ago

Deadline :

17th Jun 2022 2 years ago

Contract Start :

N/A

Contract End :

N/A

Tender Regions

CPV Codes

45000000 - Construction work

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Closed

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors