Open Closing in a 3 months
prj_7956 - Major Project SRO HWTWRP - ME4
Descriptions
The Hampshire Water Transfer and Water Recycling Project (The Project) is a Strategic Resource Option (SRO) and a major part of Southern Water’s long-term strategy to address the significant water supply shortfall in Hampshire. By using advanced water treatment technologies, the Project will transform treated wastewater, normally pumped far out to sea, into purified recycled water. This new resource will supplement natural spring water from Portsmouth Water’s Bedhampton Springs, with both sources being stored in the new Havant Thicket Reservoir. This integrated approach will maximise the reservoir’s capacity, ensuring greater water availability, especially during periods of drought. Water from the reservoir will be transferred to our existing Otterbourne Water Supply Works, where it will undergo further treatment to strict drinking water standards prior to going into supply. By establishing a sustainable and resilient water source, the Project will help safeguard essential water supplies for our customers while reducing reliance on environmentally sensitive water sources. The Project consists of a Water Recycling Plant, tunnel and pipeline connections, a High Lift Pumping Station, and a circa 42 km transfer to Otterbourne Water Supply Works inclusive of intermediate pumping stations and break pressure tanks. The Project scope includes Design, Build, Finance, Maintain and Operate (DBFMO) of new water infrastructure, including water recycling, water transfer, and substantial tunnelling works. The Project will be procured using Ofwat’s Direct Procurement for Customers (DPC) model, with a Competitively Appointed Provider (CAP) to deliver the DBFMO project. Under the DPC model, Southern Water plan to openly tender for a CAP. Southern Water has carried out several market engagement exercises to support this procurement. Southern Water does not guarantee that all activities referenced by the CPV codes will form part of any future tender notice(s), nor is the list exhaustive of all activities which may be included in any procurement process under this Project.
Engagement
This market engagement exercise will be comprised of a series of engagement activities which includes: • Market Survey • Requests for Information (RFIs) Pack comprising an RFI questionnaire and key information on the Project (to be issued early April 2026 with circa four-week deadline for responses to the RFI questionnaire) • Townhall Event (14th April, 2026) • A small number of bi-lateral meetings with selected participants Southern Water is seeking feedback in particular from investors, construction and operating and maintenance contractors and/or potential consortia (which may involve their wider supply chain) that may be interested in the Project. Southern Water will be issuing a Market Engagement Briefing Pack, which will provide further information on this market engagement exercise. The RFI Pack will inform interested parties on various aspects of the Project including the procurement process and enable them to provide feedback. The Townhall Event is expected to be soon after the launch of the RFIs where a Project update is to be provided. Bi-lateral meetings will be held with selected participants based on responses to RFIs and focusing on investors, construction and operating and maintenance contractors and/or proposed consortia (which may involve a wider supply chain). The basis on which this market engagement exercise is carried out is as follows: • Southern Water may continue this market engagement exercise as long as it considers it necessary and expressly reserves the right to conduct such other activities that it considers necessary, details of which will be provided through the Jaggaer portal (see details below); • While feedback is expected to be requested through the RFIs, Southern Water may choose not to consider or implement any or all of the suggestions made through this market engagement exercise, or may at its discretion use the outputs from this exercise to shape and refine any aspect including the procurement process before any formal competitive procurement process is launched; • This market engagement exercise is open to all interested parties. However, there are certain activities such as the bi-lateral meetings, that may be relevant to only certain interested parties, which Southern Water will determine based on RFI responses and/or their role in the supply chain; • The market engagement exercise is not a formal request for participation in any procurement. Involvement in this exercise will not confer any advantage or disadvantage on any person in respect of any future competitive procurement processes launched for the Project; • Respondents should note that information provided in response to the market engagement exercise may be disclosed by Southern Water to its directly appointed advisers and consultants (all of whom are subject to obligations of confidentiality as part of their appointment) and / or to other stakeholders such as regulators. The information provided in responses may also be disclosed, in a suitably summarised and anonymised form, to other stakeholders and to other interested persons; • Southern Water is not obliged to respond to any correspondence related to the market engagement exercise. Direct or indirect canvassing of Southern Water (or any person connected with it) by any person concerning the market engagement exercise, or any attempt to procure information outside of the defined process is discouraged and may (in certain circumstances) require the disqualification of the relevant person(s) from participation in any future competitive procurement process; • Any costs of participation in this market engagement exercise will be borne by the interested person. Southern Water is using an electronic tendering portal (Jaggaer One) which can be found at: https://southernwater.ukp.app.jaggaer.com/esop/guest/go/opportunity/detail?opportunityId=60525 It is free to register on the portal, which can be accessed at any time of day. Should you have any problems registering on the portal, you should contact Jaggaer by Email: BSUK-Sales@jaggaer.com or by phone 0800 069 8630 All updated information relating to this preliminary market engagement exercise will be issued via Jaggaer and interested parties must register (if not already registered) and regularly check Jaggaer for the latest information. Suppliers who have not previously participated in any market engagement with Southern Water are nevertheless encouraged to contact Southern Water by emailing HWTWRP@southernwater.co.uk Southern Water has carried our three previous rounds of market engagement exercises relating to the Project as detailed in the relevant notices for market engagement one (PIN: 2022/S 000-003206), market engagement two (PIN: 2022/S 000-031175) and market engagement three (PIN: 2024/S 000-034148). This market engagement exercise is expected to be the final round of market engagement relating to the Project.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
65130000 - Operation of water supplies
71500000 - Construction-related services
45200000 - Works for complete or part construction and civil engineering work
43614000 - Parts of tunnelling machinery
45221240 - Construction work for tunnels
65100000 - Water distribution and related services
71540000 - Construction management services
50000000 - Repair and maintenance services
45231300 - Construction work for water and sewage pipelines
71541000 - Construction project management services
45240000 - Construction work for water projects
45252126 - Drinking-water treatment plant construction work
66100000 - Banking and investment services
71340000 - Integrated engineering services
71000000 - Architectural, construction, engineering and inspection services
45221000 - Construction work for bridges and tunnels, shafts and subways
66122000 - Corporate finance and venture capital services
45231100 - General construction work for pipelines
Keywords
growth capital
turnkey projects
waterworks build
facility design
public works
banking services
subway build
asset placement
infrastructure
site preparation
capital markets
risk management
earthworks
equity financing
VC funding
technical design
TBM spare parts
utility services
surveying
budget planning
building engineering
resource planning
risk mitigation planning
cost overrun analysis
building projects
pipeline building work
portfolio funding
investment facilitation
drainage pipeline works
contract administration
procurement oversight
progress reporting
site logistics strategy
drinking water delivery
cross-mountain tunneling
fluid line installation
scaffold planning
tunnel construction
construction logistics
substructure works
general contracting
sewage disposal conduit
water utility operation
document control system
canal construction
troubleshooting visit
public water network
contractor scheduling
project scheduling
calibration service
financial brokerage
contract closure process
shaft erection work
construction work
structural construction
onsite repair support
structural engineering
stakeholder liaison
waterproofing services
equipment repair service
civil buried structure
venture investment
value engineering
civil engineering
dam and reservoir works
sanitary sewer build
wastewater main laying
construction consultancy
planning consultancy
budget reconciliation
milestone tracking
corporate fundraising
financial intermediation
water supply control
trench & pipe laying
site logistics planning
pressure zone management
water infrastructure
water main upkeep
deliverable verification
startup financing
broad pipeline work
urban transit structure
site clearing services
integrated engineering
earthworks services
resource coordination
utilities trenching
bore construction
water network monitoring
workflow optimization
tunnel excavation
utility water operations
utility water line build
regional water service
investment advisory
freshwater engineering
financial operations
municipal water supply
architectural services
road/rail tunnel work
repair diagnostics
clean water provisioning
contractor briefing
emergency repair team
water distribution
utility line civil works
civil tunnel engineering
inspection services
municipal water system
waterworks services
private equity services
site utilities installation
heavy equipment operation
viaduct and underpass building
market investment services
water reticulation civils
transportation passage construction
collaborative engineering services
access infrastructure services
sub-surface structure build
tunnelling machinery parts
joint engineering consultancy
overhead and underground crossing construction
potable water network maintenance
cross discipline project engineering
integrated technical services
temporary facilities setup
water pipeline installation
clean water filtration station
conduit trench construction
tunnel boring machine components
underground passage build
maintenance contract service
drinking-water treatment plant construction
fluid transport pipelaying
sewage conduit construction
domestic waterworks build
project communication coordination
hydraulic structure build
hydrant operation service
regulatory compliance monitoring
hydraulic civil engineering
general pipeline installation
mechanical pipeline erection
holistic engineering provision
marine water project works
unified engineering solutions
Construction structures and materials
multidisciplinary engineering
underground excavation machine parts
component replacement service
pre-construction services
quality assurance planning
water infrastructure construction
sewage infrastructure erection
water hygiene infrastructure
building construction support
drinkable water treatment plant
pipeline water distribution
water pipeline management
corporate financial advisory
service schedule planning
venture capital investment
construction coordination
municipal water treatment facility
change order administration
subterranean transit work
construction project management
bridge and tunnel construction
tunneling and bridging build
combined engineering services
water network pipeline work
milestone target planning
systems engineering integration
energy pipe systems build
preventive maintenance program
potable water purification works
site operations management
noise control implementation
civil crossing facilities
general pipeline assembly
modular construction support
corporate finance planning
irrigation infrastructure
structural framework setup
Tender Lot Details & Award Criteria
1 Tender Lots
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :