Closed
Provision of Groundworks, Drainage & Construction
Request tender documents
Save your time. You just request and we will send you the available documents.
Request for bid service
Save your time. You just request and we will arrange tender related all available documents to bid writers for the best possible quote.
Descriptions
1.1IntroductionThis project is part of a new development programme involving the construction of accommodation to attract the attention of potential day visitors outside of Wales as well as attracting holidaymakers looking for alternative family accommodation. The market for quirky accommodation attached to attractions has seen huge growth in recent years with the likes of Legoland, The Alton Towers Resort, Port Lympne Wild Animal Park, Warwick Castle Knight’s Tents, London Zoo, all offering accommodation, etc. The project is not just aimed at increasing footfall during the shoulder periods but for us, extending our season further as the accommodation offering expands and we move to being open 365 days a year.1.2ObjectivesFolly Farm Leisure Ltd is embarking upon a bespoke construction of a holiday park to support the existing leisure operations. Phase1 of this project construction will include ground works to enable siting of themed lodges and touring caravans, along with the development of shower blocks, access control kiosk, drainage and electrical infrastructure and landscaping.Folly Farm Leisure Ltd are inviting contractors to assist in this development.1.3Time ScaleThe project is expected to initially run for 21 weeks from 1st April 2019 to 30 August 2019.1.4LocationThe work will be carried out at Windberry Top farmland, just north but adjacent to the Folly Farm Leisure Folly Farm Adventure Park and Zoo at Begelly, Kilgetty, Pembrokeshire SA68 0XA.1.5Project activitiesThis tender publictation is seeking sub-contractors to bid for a programme of GROUNDWORKS – to include Preliminaries, General Earthworks, Ground Reductions, Foul and Storm Drainage, Retaining Walls and Outfall works.Sub-structures to include: Foundations & Pads, Services, External Finishes, Road Surfacing and Footpaths and all other associated Groundworks tasks.Construction to include: Toilet and Shower BuildingNote:•Minor engineering should be allowed for by the contractor•Contractor should allow all necessary propping & earthwork support associated with the works•On Site Quarry available•Site visit would be beneficial to appreciate the project works within the clients existing working environment2.1General Information and conditionsFolly Farm Leisure Ltd wish to appoint a sub-contractor to carry out the work described above. The appointment will be by a process of competitive tendering, advertised through the Sell2Wales website. The requirement is set out in the specification, which is included below.2.2Submission of Written Quotation•Prospective supplier/s are required to submit a written quotation either as a pdf or word document to chris@folly-farm.co.uk•Written Quotations must be submitted no later than the deadline listed on the title page.•Your response must bear the Quotation reference listed on the title page.•The Quotation and all accompanying documents to be submitted together. Once accepted, all details of the Quotation, including prices and rates, submitted by the winning bidder are to remain valid for the duration of the project timeline as indicated earlier in this publication.•Quotations should be priced in pounds sterling (GBP) and all payments will be made in pounds sterling.2.3Queries relating to this Request for Quotation•Any query in connection with the invitation should be sent to chris@folly-farm.co.uk or sandra.hine@folly-farm-co.uk2.4Acceptance of the QuotationFolly Farm Leisure Ltd does not undertake to accept the lowest Quotation, or part, or all of any Quotation, and the acknowledgement of receipt of any submitted Quotation shall not constitute any actual or implied agreement between Folly Farm Leisure Ltd and the Supplier. Folly Farm Leisure Ltd reserves the right to accept any part, or all, of any Quotation or Quotations at its sole discretion. Our evaluator(s) will consider all Quotations correctly submitted and will select one or more with a view to reaching a contractual agreement subject to clarification of any outstanding matters. We reserve the right to vary the contract requirements and value depending on project requirements.2.5Specific guidance on tender preparationThe above project is scheduled to commence on site date of 1st April 2019.Costs:Your lowest quotation is invited for the sub-contract work shown above inclusive of all Labour, Plant and Materials, in accordance with the included following documents: -Holiday Village Bills of Quantities / Schedule of works (pages): Groundworks, Drainage and Build PackageSpecification (pages) : included on drawingsDrawings:RPS – Phasing PlanRPS – Toilet Shower BlockRPS – Proposed Site Layout Level ChangesRPS – 8782-0001-002 Site location PlanRPS – 8782-0002-006 Illustrative Site MasterplanRPS – 8782-0042-01 Rev_A illustrative New Toilet Shower Block Building & Staffed Access Kiosk – Ploor Plans & ElevationsRPS – 8782-0042-01 Toilet & Shower BlocksRPS – RCEF53282-D001_Rev_A – Folly Farm Detailed Drainage LayoutRPS – RCEF53282-D002_Rev_A – Folly Farm Detailed Drainage LayoutOther: Level Changes Technical NoteCross Section Level ChangesAmendment of Planning ConditionsDischarge of Planning ConditionsAdditional documents, plans and supporting information including access statements and historic mining reports are available on the following planning portal with Pembrokeshire County Council:http://planning.pembrokeshire.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=16/0301/PA&backURL=%3Ca%20href=wphappcriteria.display?paSearchKey=875141%3ESearch%20Criteria%3C/a%3E%20%3E%20%3Ca%20href=%27wphappsearchres.displayResultsURL?ResultID=2598638%26StartIndex=1%26SortOrder=APNID%26DispResultsAs=WPHAPPSEARCHRES%26BackURL=%3Ca%20href=wphappcriteria.display?paSearchKey=875141%3ESearch%20Criteria%3C/a%3E%27%3ESearch%20Results%3C/a%3ETimescale: Enquiry Programme attached, it is envisaged that out of hours works will be required and must be included within your rates.Subcontract Particulars: NoneFLUCTUATIONS: Fixed Price for DurationDAYWORK: Please identify your hourly (all-inclusive) rate for all labour and plant costs, together with %mark-up required to the nettDISCOUNT: Please clearly state within your quotation the main contractors discount being offeredNOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=85368.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45212000 - Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
45232453 - Drains construction work
44100000 - Construction materials and associated items
45232450 - Drainage construction works
45212130 - Amusement park construction work
71500000 - Construction-related services
45232411 - Foul-water piping construction work
44110000 - Construction materials
45212100 - Construction work of leisure facilities
45212120 - Theme park construction work
45000000 - Construction work
45231221 - Gas supply mains construction work
45233226 - Access road construction work
Keywords
masonry products
theme park build
public works
masonry supplies
building sites
structural work
renovation work
driveway paving
gutter channel build
surface drain excavation
construction accessories
hospitality venues
site construction
access road paving
scaffold planning
adventure park build
connector road surfacing
construction logistics
amusement construction
rides installation
foul drain network build
aggregate products
infrastructure projects
sewer service line build
community leisure hall
construction work
drainage network build
recreational structures
thrill ride installation
waterproofing services
bulk building items
construction services
civil engineering
family leisure building
sewage pipe installation
foul water piping build
recreational site build
leisure park build
trench drain building
construction materials
park ride assembly
communal gas main build
domestic sewage plumbing
gas mains installation
amusement structures
drains construction
building supplies
carousel construction
cultural centre building
sports venue development
kiddie ride construction
waste-water pipework
site clearing services
amusement park building
earthworks services
utilities trenching
building construction
theme attraction works
recreation centre build
construction goods
attraction construction
foul-water trench laying
play centre construction
game zone construction
linear drain works
building materials
entertainment park works
field drainage works
site utilities installation
heavy equipment operation
sub-surface drainage system works
surface water drainage build
park attractions construction
access infrastructure services
entertainment venue construction
service road surface works
temporary facilities setup
hotel and restaurant build
outdoor entertainment build
lodging facility erection
funfair infrastructure build
high-pressure gas supply build
road drain infrastructure
land drainage infrastructure
entertainment facility works
tourism related construction
carnival facility construction
amusement park construction
flood relief channel build
family entertainment structures
pre-construction services
gas distribution pipeline build
building construction support
wastewater plumbing works
gas mains network construction
leisure facility construction
concrete drainage ditch build
leisure/sports/cultural building work
drainage system construction
utility gas conduit works
hospitality infrastructure
channel-lined drain installation
wastewater conduit erection
sanitation pipeline construction
road-side drainage construction
city gas pipeline installation
noise control implementation
storm drainage pipeline works
leisure infrastructure build
surface water control construction
public gas system construction
modular construction support
stormwater channel installation
sports complex construction
utility gas line erection
structural framework setup
roadway storm drain installation
residential gas main construction
Workflows
Status :
Procedure :
Suitable for SME :
Nationwide :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
Tenderbase ID :
Low Value :
High Value :
Buyer Information
Name :