Awarded

RA341937 - NetworkSwitchGear

Descriptions

Notes ----- The successful bidder will be given more information about the network post award, for security reasons only basic information is provided below. Wigston - Existing equipment. ----------------------------- The Core switch currently is an Extreme Networks Black Diamond 8100 with 12x10gbps XFP ports. This connects to 5 stacks of Extreme Summit switches which will be replaced at a later stage, 30 switches in all (1440 ports). Wigston connects back to Hinckley for internet and system access. Hinckley - Existing equipment. ------------------------------ The Core switch currently is a Cisco Catalyst 4510R+E with Sup7A line cards. This switch uplinks to a mixture of POE and non POE 2960 series Catalyst switches 23 units in total. The Hinckley core switch is technically the hub of the network with our Firewall being located at this site and 1gbps intersite links from all other campuses ingress here for internet access. Connectivity from core switch to edge switch is provided by means of x2 1gbps LACP RJ45 connections, therefore the Hinckley campus will initially require more copper connectivity until such time as the edge equipment is replaced with 10gbps uplink capable equipment. Due to time constraints and other projects we do not require quotes for the edge equipment described above. This initial engagement is to replace two campuses core switch equipment only. Objectives. ----------- To have a fully supported core switch from the manufacturer where firmwares are updated frequently to mitigate security risks and foster a stronger more secure network. To provide easier management functionality using cloud technologies To harmonise, in the longer term all networking vendor equipment to one brand and model set to provide more agile solutions to networking changes throughout the equipment lifecycle. Features required. ------------------ The switches must have following minimum feature set: VLAN support, Layer3 Routing, ACLs, 802.1x, LLDP, QoS, Port Mirroring, Traffic Monitoring, Configuration Templates, Dual PSUs, Modular Field Replaceable Fans, stacking by means of dedicated stacking cables - Please provide DATASHEET detailing all feature sets for the equipment to be supplied. Warranty period for cloud switches must be 10 years minimum and cover cloud access and equipment for the same duration. - M-Th 1000-1630 teams:austen.lowe@nwslc.ac.uk - To access this competition: login to https://suppliers.multiquote.com and view the opportunity RA341937. Not registered on MultiQuote - visit https://suppliers.multiquote.com then register and quote RA341937 as the reason for registration. Any queries please contact MultiQuote on 0151 482 9230.

Timeline

Published Date :

2nd Jul 2024 in a 6 months

Deadline :

2nd Jul 2024 in a 6 months

Tender Awarded :

1 Supplier

Awarded date :

2nd Jul 2024

Contract Start :

2nd Jul 2024

Contract End :

2nd Jul 2024

CPV Codes

30200000 - Computer equipment and supplies.

Tenderbase Categories

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Assign to :

Tender Progress :

0%

Details

Notice Type :

Open opportunity

Tender Identifier :

IT-378-246-T: 2024 - 001

TenderBase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Region :

North Region

Attachments :

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Designation :

Chief Executive Officer

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors