Closed
Refrigeration upgrade
Descriptions
Phase 1To supply and install approximately 260 meters of 8inch Stainless Steel water pipe to be fixed clipped and lagged, along with all necessary bends tees couplers and electronic shut off valves.To supply and fit all necessary isolating valves along with four water electrically operated solenoid shut off valves to control the temperature in each room.The supply and fitting of one 500 lite water buffer tank and to connect to 1 x existing water pump.To water pressure test the system to ensure there are no leaks.Trane will commission and test the water chiller once the water system is complete.Quote to include all labour and travel required in order to completePhase 2o supply install and commission 1 x train air cooled glycol water chiller m/n RTAC300STD.This chiller will be connected to the following new evaporator coilsRoom 1 3 dual discharge evaporatorsRoom 2 3 x dual discharge evaporatorsRoom 3 3 x dual discharge evaporatorsRoom 4 3 x dual discharge evaporatorsRoom 5 1 dual discharge evaporatorQuote to include any additional water pumps water buffer tank electronic water regulating valves all associated water pipe fittings fixings and pipe insulation.supply and fitting of 1 x 200kw water heat exchangerNOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=133146.
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45331231 - Installation work of refrigeration equipment
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors