Awarded

Refurbishment of Existing Toilet Area – Strip-Out, Plumbing, Joinery, Mechanical and Finishing Works

Descriptions

The works include the full strip-out, refurbishment, and reinstallation of sanitary fittings, finishes, and associated building and plumbing works to the existing toilet area.

1. Strip Out and Preparation

a. Strip out and remove existing toilet, sink, and associated fittings.

b. Carry out full demolition/soft strip of redundant fixtures, finishes, and

pipework as required.

c. Remove existing internal door and door furniture.

d. Dispose of all waste materials in accordance with site waste management and environmental regulations.

e. Make good all disturbed areas to a sound and even finish ready for decoration.

2. Windows

a. Make good 2 no. existing windows, including repair of frames, cleaning, sealing, and preparation for decoration as required.

3. Decoration

a. Prepare all wall, ceiling, and wood surfaces.

b. Apply one mist coat and one full coat of quality trade emulsion to walls and ceilings.

c. Apply suitable finish paint to all woodwork, trims, and window frames.

 

4. Joinery Works

a. Refurbish existing door, including sanding, filling, repainting/staining, and fitting new door furniture (handle, lock, and signage).

b. Install shelving to support new water heater - securely fixed, level, and able to support full load of the appliance.

c. Construct and install heater cover (removable for access and maintenance), finished to match surrounding décor.

d. Carry out any required boxing-in of pipework to provide a neat and accessible finish.

5. Plumbing Works

a. Supply and install new close-coupled WC suite, including pan, cistern, seat, and all fixings.

b. Supply and install new sink with thermostatic mixing tap.

c. Supply and install new 15-litre electric water heater.

d. Complete all associated pipework, waste, and lagging to meet current Building and Water Regulations.

e. Pressure test system upon completion.

6. Mechanical Works

a. Core hole through external wall for new extract fan installation (fan to be supplied separately or as specified).

b. Seal all penetrations weather-tight and make good finishes.

 

7. Completion

a. Ensure all works are clean, fully operational, and tested.

b. Remove all rubbish and debris from site.

c. Provide user instructions for all new equipment (heater, tap, etc.).

d. Leave area ready for immediate use

Timeline

Published Date :

17th Nov 2025 Yesterday

Deadline :

N/A

Tender Awarded :

1 Supplier

Awarded date :

N/A

Contract Start :

N/A

Contract End :

N/A

Keywords

demolition work

site clearance

wrecking services

debris removal

preparatory demolition

structure clearing

site decommissioning

demolition clearance

removal work

building takedown

plumbing work

sanitary installation

pipe fitting

drainage system assembly

sanitary fixture installation

joinery work

wood joinery fitting

timber frame installation

custom wood installation

decoration work

decorative painting

ornamental finishing

aesthetic surface treatment

decorative interior work

Tender Lot Details

2 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Awarded

Procedure :

N/A

Suitable for SME :

N/A

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible Competitors

1 Possible Competitors