Open Closing in a 1 month

Residential Development, Nunan’s Corner, Broadford

Descriptions

Demolition of an existing two-storey vacant petrol station, commercial premises and vehicle maintenance building and construction of 4 no. two-storey two bedroom terraced dwellings and 3 no. single-storey one bedroom terraced dwellingssee more

Timeline

Published Date :

26th Mar 2026 Yesterday

Deadline :

30th Apr 2026 in a 1 month

Contract Start :

N/A

Contract End :

N/A

Keywords

masonry

earthmoving

geotech testing

general building

family homes

land clearing

subsoil testing

turnkey projects

foundation prep

site readiness

excavation work

wrecking work

building wiring

house building

public works

housing projects

private homes

new buildings

demolition prep

low rise flats

building sites

soil sampling

structural work

infrastructure

plumbing work

land preparation

plastering work

ground surveys

pipe fittings

removal work

site cleanup

MEP works

site preparation

site servicing

custom homes

earthworks

ground clearing

insulation work

land development

renovation work

gas site works

site demolition

site clearance

single dwellings

debris removal

demolition work

cable routing

excavation

site grading

finishing trades

superstructure

site leveling

heavy earthwork

painting work

suburban housing

site clearing

glass fitting

prebuild site servicing

building projects

site investigation

energy loss reduction

residential construction

structural removal

window glazing fitting

groundwork services

structure clearing

mechanical system setup

site preparation work

clustered housing

site construction

foundation analysis

domestic dwellings

apartment building works

geotechnical surveys

woodwork installation

site-development work

circuit installation

final touch trades

internal power grid

architectural building

wall smoothing plaster

general contracting

demolition of structures

sanitary installation

render application

infrastructure projects

preparatory demolition

structural wood fitting

building installation

heat barrier fitting

drainage system assembly

vegetation removal

interior painting

surface preparation

technical fit-out

building demolition work

building takedown

residential units

glazing installation

family house projects

construction work

structural construction

standard houseworks

lighting and power setup

shell construction

controlled demolition

vegetation clearing

domestic house projects

construction services

civil engineering

service integration

engineering construction

systems installation

building completion work

preparatory works

utility corridor prep

machinery mounting

industrial demolition

building dismantling

general engineering work

structural demolition

municipal site prep

demolition services

borehole drilling

final construction stage

detached home building

gypsum finish work

building wrecking

building demolition

building construction

urban development works

building erection

utility enablement

wrecking services

carpentry fitting

housing units build

electrical installation

explosive demolition

houses construction work

site decommissioning

ground assessment

domestic buildings

manual demolition

single family homes

demolition clearance

individual housing

completion civils

topsoil stripping

family home construction

standalone residences

integrated engineering works

residential house building

technical construction services

plant equipment installation

electrical infrastructure

electrical connection works

interior and exterior finishing

completion of interiors/exteriors

comprehensive construction works

electrical network installation

floor and wall covering work

mechanical installation work

joinery installation work

interior infrastructure install

private housing development

surface finish installation

electrical systems fitting

individual dwelling works

structural and civil works

interior system installation

potable water site development

building handover preparation

flooring and wall surfacing

ground investigation work

detached house construction

interior surface finishing

commercial building works

thermal insulation installation

building envelope insulation

domestic house construction

sanitary fixture installation

single-family houses construction

construction finish works

civil-structural engineering

building service deployment

civil engineering project work

infrastructure and structures build

decorative surface coating

multi dwelling construction

multidisciplinary engineering build

Tender Lot Details & Award Criteria

1 Tender Lots

Let’s Get you Started ✍

Get to see all tender details more briefly

Already have an account ?

Workflows

Status :

Open

Procedure :

open

Suitable for SME :

No

Nationwide :

No

Assign to :

Tender Progress :

0%

Details

Notice Type :

Tender

Tender Identifier :

IT-378-246-T: 2024 - 001

Tenderbase ID :

310724019

Low Value :

£100K

High Value :

£1000K

Buyer Information

Address :

Liverpool Merseyside , Merseyside , L13 0BQ

Website :

N/A

Procurement Contact

Name :

Tina Smith

Phone :

0151 252 3243

Email :

tina.smith@shared-ed.ac.uk

Possible bidding competitors

Possible bidding competitors