Closed
Re-stabilisation of Wales National Pool Embankment Works
Descriptions
The project comprises the removal of the high level footpath and steps adjacent the pool building and the top 600mm of soil from the embankment and replacing with engineered fill and topped off with astroturf. Handrailing to match existing is to be installed as detailed.There is also two areas of localised drainage works involving, trenching, excavating, installing a new manhole and two yard gullies and reinstating the ground as existingFor further details see the specification and drawings that have been included within the tender documentation.NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=84599
Timeline
Published Date :
Deadline :
Contract Start :
Contract End :
Tender Regions
CPV Codes
45000000 - Construction work
Workflows
Status :
Assign to :
Tender Progress :
Details
Notice Type :
Tender Identifier :
TenderBase ID :
Low Value :
High Value :
Region :
Attachments :
Buyer Information
Address :
Website :
Procurement Contact
Name :
Designation :
Phone :
Email :
Possible Competitors
1 Possible Competitors